My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Damon Belanger
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Under 60K
>
Agmt16 Damon Belanger
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 10:14:42 AM
Creation date
10/12/2016 10:08:58 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Damon Belanger
PROJECT NAME
Artistic Services Wall mural at University Art Building 2550 El Camino Real
RMP File Number
304.5
Date
10/11/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Review of design and installation method within 30 days prior to the commencement of <br /> installation; and <br /> D. Periodic on-site inspections as Work progresses; and <br /> E. Final inspection and acceptance after installation. <br /> The reviews shall occur within two weeks of the Artist's written notice to the City of readiness <br /> for the review. <br /> If the Work does not conform to the proposal as described in this Exhibit A or as mutually agreed <br /> by the parties, notice of specific non-conformity and request for the Artist to address the specific <br /> non-conformity shall be given to Artist in writing within two weeks after the review period. Artist <br /> shall have thirty days to address and correct any non- conformity. lf, after resubmission, the <br /> Work still does not conform, the City retains the right to immediately terminate the agreement <br /> and remove the non-conforming work product. <br /> 6. Project Close-out. <br /> Upon completion and installation of the Work, the Artist will furnish the City with a full Release <br /> and Waiver of Lien, plus releases from any major supplier or subcontractor involved with the <br /> Work. The Artist shall also submit a maintenance report to City including specific <br /> recommendations for ongoing maintenance and possible repairs as well as photo/video and <br /> written documentation off fabrication and installation of the Work, such <br /> as to assist in maintenance and/or repair, if so requested by the City. <br /> 7. Repairs, Maintenance, or Alterations. <br /> A. The Artist is responsible for all parts and workmanship for a period of one year after <br /> acceptance of the Work by the City and will replace any defective parts or rework any <br /> defective craftsmanship in a timely fashion at no cost except as provided hereafter in <br /> sections 7B and 7C. <br /> B. The Artist is not responsible for and will not be held liable for any damage to the Work, <br /> its surfaces, or environment caused by personnel of the City or by contracted <br /> employees, visitors, or others, beyond the control of, the Artist. <br /> C. The Artist is not responsible for and will not be held liable for any damages to the work <br /> by weather conditions, acts of God, or other acts abnormal to the site. <br /> 8. Subletting or Assignment of Work. <br /> The Artist will not sublet or assign any of her obligations under this contract that require her <br /> artistic talents. Artist may sublet or assign obligations that do not require her artistic talents, <br /> including, but not limited to, such obligations as transport of the Work and installation. <br /> ATTY/AGR/2016.277/DAMON BELANGER <br /> REV: 09-27-16 RL <br /> Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.