My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-10-17 Closed and Special Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-10-17 Closed and Special Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 9:39:39 AM
Creation date
10/13/2016 4:26:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
10/17/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF REDWOOD CITY 6.1.A. - Page 23 <br /> BROADWAY PLAZA MIXED-USE PROJECT EIR <br /> EXHIBIT A: SCOPE OF WORK AND COSTS <br /> COSTS <br /> As shown in Table 2,the estimated cost to complete the scope of work described in this <br /> proposal is $137,053. The billing rates for each team member are included in Table 2. <br /> PlaceWorks bills for its work on a time-and-materials basis with monthly invoices.We are <br /> flexible regarding project costs and hope that you will not eliminate us from <br /> consideration on the basis of cost alone. <br /> PlaceWorks recommends planning for a 5 percent to 10 percent contingency fund to <br /> cover any unforeseen out-of-scope work that might be necessary for the project. <br /> ASSUMPTIONS <br /> This scope of work and cost estimate assumes that: <br /> • Billing rates are guaranteed through December2017. Billing rates would be subject <br /> to an increase of up to 6 percent on January 1,2018,and in each subsequent year <br /> thereafter. A budget increase would be necessary to cover costs incurred after <br /> January 1,2018. <br /> ■ Our cost estimate includes the meetings shown in Chapter 4. Additional meetings <br /> would be billed on a time-and-materials basis. <br /> • No more than 50 hours of PlaceWorks staff time will be required to respond to <br /> comments on the Draft EIR. If additional labor is necessary, a contract amendment <br /> allowing additional work will be necessary. <br /> • All products will be submitted to the City of Redwood City in electronic(PDF)format, <br /> except for printed copies that are specifically identified in Table 2. This is an <br /> allowance only, based on the numbers of products and copies shown in Chapter 4. If <br /> this allowance is exceeded, additional printing costs will be billed at PlaceWorks <br /> actual cost. <br /> • City of Redwood City staff will be responsible for meeting logistics, including <br /> schedule coordination, document production, printing notices, mailing costs, room <br /> reservations,room set-up and take-down,and refreshments. <br /> ■ PlaceWorks will send an invoice for work completed each month. The invoice will <br /> show hours worked by labor category, billing rate, and total by labor category plus <br /> subconsultants and reimbursable expenses. <br /> PLACEWORKS 11 <br /> ATTY/AGR.2016.251/Placeworks AUGUsT 31,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.