My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-10-17 Closed and Special Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-10-17 Closed and Special Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 9:39:39 AM
Creation date
10/13/2016 4:26:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
10/17/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.D. - Page 30 <br /> Exhibit C El Camino Real <br /> Stormwater Treatment Measure Operation and Maintenance <br /> Inspection Report to the City of Redwood City, California <br /> This report and attached Inspection and Maintenance Checklists document the inspection <br /> and maintenance conducted for the identified storrnwater treatment measure(s)subject to <br /> the Maintenance Agreement between the City and the property owner during the annual <br /> reporting period indicated below. <br /> I. Property Information: <br /> Property Address or APN: 575 El Camino Real,Redwood City,_CA 94063 <br /> Property Owner: C&H Holdings LLC <br /> II. Contact information: <br /> Name of person to contact regarding this report: Chris Hsiung <br /> Phone number of contact person: Email: ehsiung @comcast.net <br /> Address to which correspondence regarding this report should be directed: <br /> 5 Estates Dr. <br /> Millbrae,Ca 94030 <br /> III. Reporting Period: <br /> This report,with the attached completed inspection checklists,documents the inspections <br /> and maintenance of the identified treatment measures during the time period from <br /> to <br /> IV. Stormwater Treatment Measure Information: <br /> The following stormwater treatment measures(identified treatment measures) are located <br /> on the property identified above and are subject to the Maintenance Agreement: <br /> Identifying Type of Treatment Measure Location of Treatment Measure on the <br /> Number of Property <br /> Treatment <br /> Measure <br /> Bio 1 Bio-Retention NB corner of parking log <br /> Bio 2 Rio-Retention SO'south of Bin I <br /> Page 1 O&M Inspection Report <br /> ATTY/AGR.2016.255/C&H Holding Company, LLC-STMMA <br />
The URL can be used to link to this page
Your browser does not support the video tag.