My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 City of Menlo Park (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Under 60K
>
Agmt16 City of Menlo Park (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 8:34:49 AM
Creation date
10/20/2016 8:31:42 AM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Menlo Park
PROJECT NAME
Atherton Channel Maintenance
RMP File Number
304.5
Date
10/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification #1600-2013-0356-R3 <br /> Streambed Alteration Agreement <br /> Page 5 of 23 <br /> 2. Avoidance and Minimization Measures <br /> To avoid or minimize adverse impacts to fish and wildlife resources identified above, <br /> Permittee shall implement each measure listed below. <br /> 2.1 Work Location Restriction. At Site 1 , to protect saltmarsh harvest <br /> mouse and other saltmarsh species, routine maintenance activities <br /> shall be limited to Atherton Creek upstream of the bridge at the <br /> intersection of 3723 South Haven and Bayfront Expressway. <br /> 2.2 Seasonal Work Period. To protect fish and wildlife and their habitats, <br /> work within the stream and riparian zone shall be limited to April 15 <br /> to October 31 . <br /> 2.2.1 Work Period Modification. If Permittee needs more time to <br /> complete project activities, work may be authorized outside <br /> of the work period and extended on a day-to-day basis by <br /> CDFVV representative, Suzanne Deleon, at <br /> suzanne.deleonfi wildlife.ca.gov, or if unavailable, through <br /> contact with the CDFW Bay Delta Regional Office by mail, <br /> phone (707-944-5500) or fax (707-944-5553). Permittee <br /> shall submit a written request for a work period variance to <br /> CDFW for approval at least five (5) calendar days prior to <br /> November 1 . The work period variance request shall: 1 ) <br /> describe the extent of work already completed; 2) detail the <br /> activities that remain to be completed; 3) detail the time <br /> required to complete each of the remaining activities; and 4) <br /> provide photographs of both the current work completed and <br /> the proposed site for continued work. Work period variances <br /> are issued at the discretion of CDFW. CDFW will review the <br /> written request to work outside of the established work <br /> period and may require additional measures to protect fish <br /> and wildlife resources as a condition for granting the <br /> variance. Any additional measures shall be made part of <br /> this Agreement. <br /> 2.3 Work Period in Dry Weather Only. Work within the stream and <br /> riparian zone shall be restricted to periods of no or low stream flow, <br /> low rainfall (less than 1/4" per 24 hour period) and dry weather as <br /> allowed during the work period specified in Measure 2.1 , <br /> 2.4 Weather Forecasts. Precipitation forecasts and potential increases in <br /> stream flow shall be considered when planning construction <br /> activities. Permittee shall monitor the 72-hour forecast from the <br /> National Weather Service (NWS; http.//www.nws.noaa.gov). When <br /> there is a forecast of more than 40% chance of rain, or at the onset <br /> REV: 09-20-16 VR <br /> ATTY/AGR/2016.286/CITY OF MENLO PARK — ATHERTON CHANNEL MAINTENANCE <br />
The URL can be used to link to this page
Your browser does not support the video tag.