My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 City of Menlo Park (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Under 60K
>
Agmt16 City of Menlo Park (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 8:34:49 AM
Creation date
10/20/2016 8:31:42 AM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Menlo Park
PROJECT NAME
Atherton Channel Maintenance
RMP File Number
304.5
Date
10/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a <br /> cS 0 <br /> 9' Q A <br /> CITY OF <br /> MENLO PARK <br /> ENGINEERING DIVISION <br /> 701 Laurel Street / Menlo Park, CA 94025-3483 <br /> (650) 330-6740 / Fax (650) 327-5497 <br /> EXHIBIT A <br /> SCOPE OF WORK <br /> Atherton Channel Maintenance for the City of Menlo Park <br /> The proposed work shall consist of the removal of debris, vegetation, and roots from the side <br /> banks of the Atherton Channel (Channel) located in the City of Menlo Park. The work shall be <br /> limited to the side banks and no sediment shall be removed from the bottom of the Channel. <br /> The total area to be cleared is approximately 0.5 acres. All work shall conform to the <br /> requirements of the attached draft Streambed Alteration Agreement (SAA) with the California <br /> Department of Fish and Wildlife (CDFW) (Attachment A) . <br /> LOCATION OF WORK: <br /> The work shall be performed within the Channel (described as Site 1 in the draft SAA) which is <br /> approximately 1000-foot long section between Interstate Highway 101 and Haven Court Bridge <br /> located at 3723 Haven Avenue. The Channel is approximately ten (10) to 15 feet wide. A Site <br /> Plan is included in Attachment B. Staging and access for the project will be from the public right <br /> of way on Marsh Road and Haven Avenue, adjacent to the Channel. No work shall be done <br /> within any culvert. <br /> TASKS DESCRIPTION : <br /> The following tasks shall be performed : <br /> 1 . Remove trash and debris embedded within the Channel using hand tools and a <br /> clamshell bucket. <br /> 2. Tree and Vegetation Removal: <br /> a. Remove living vegetation in the Channel and on the lower half of the creek banks <br /> using hand tools. Trees and other woody vegetation shall only be trimmed, not <br /> removed , to the extent necessary to allow a specific level of access and for <br /> specific types of equipment (e.g . crane, clamshell bucket) or to restore normal <br /> streamflow. <br /> REV: 09-20-16 VR <br /> ATTY/AGR/2016.286/CITY OF MENLO PARK - ATHERTON CHANNEL MAINTENANCE <br />
The URL can be used to link to this page
Your browser does not support the video tag.