Laserfiche WebLink
Page 4 of 6 <br /> comply with all City of Menlo Park standards. Construction operations shall be conducted in <br /> such a manner to cause as little inconvenience to vehicle traffic as possible. <br /> SCHEDULE, WORK DURATION AND HOURS: <br /> The maintenance activities are tentatively scheduled for the month of October 2016, and will be <br /> performed between 6:00 AM to 6:00 PM on Saturdays and Sundays, except when otherwise <br /> specified by Public Works. This work is estimated to be completed in five (5) days. <br /> WORKER ACCESS TO FACILITIES: <br /> The City of Redwood City shall provide access to toilet facilities for its workers. There are no <br /> public facilities near the work site. <br /> POLLUTION CONTROL: <br /> The City of Redwood City shall follow all City of Menlo Park NPDES requirements and Best <br /> Management Practices (e.g., straw or fiber rolls, storm drain filters) to keep miscellaneous litter <br /> and trash out of the Channel and storm drains. The City of Redwood City shall keep the City of <br /> Menlo Park right of way clean of debris, except for areas used for de-watering of spoils. After <br /> removal of de-watered spoils, the City of Redwood City shall leave the area in as clean a <br /> condition as it was before the work. <br /> Attachments: <br /> Attachment A — CDFW Draft Streambed Alteration Agreement <br /> Attachment B - Site Plan <br /> 9/15/2016-9:21 PM <br /> REV: 09-20-16 VR <br /> ATTY/AGR/2016.286/CITY OF MENLO PARK — ATHERTON CHANNEL MAINTENANCE <br />