My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-10-24 Closed and Joint SA PFA HHCC
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-10-24 Closed and Joint SA PFA HHCC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 4:45:27 PM
Creation date
10/20/2016 5:13:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/24/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.1.E. - Page 13 <br /> interface with the public shall be maintained in a neat, orderly, sanitary, and safe <br /> condition, and contractor shall at all times maintain the work area in a neat and <br /> orderly condition. <br /> 1.15. Working Day <br /> The Contractor's working day activities shall be limited to the hours between 7:30 <br /> a.m. and 4:00 p.m., Monday through Friday, unless otherwise specified by the City in <br /> writing. <br /> 2. Tasks <br /> Contractor is responsible for performing utility trench repair work in accordance with the City's <br /> Engineering Standards. Contractor is responsible for following the most up-to-date versions of <br /> the City's Engineering Standards, which are available online at <br /> http://www.redwoodcity.org/dep tlnents/community-development-department/engineering- <br /> transportation/engineering/engineering-standards. <br /> Work may include concrete and asphalt repairs, irrigation system repair, drain line installation, <br /> and additional sub-base excavation. <br /> 2.1. Notification to Residents and Businesses <br /> Contractor is responsible for performing all work so that it meets or exceeds the <br /> standards established in Section 01350 Notification to Residents and Businesses of <br /> Redwood City's Standard Technical Specifications. <br /> 2.2. Traffic Regulations <br /> Contractor is responsible for performing all work so that it meets or exceeds the <br /> standards established in Section 01550 Traffic Regulations of Redwood City's <br /> Standard Technical Specifications. <br /> 2.3. Stormwater Pollution Prevention <br /> Contractor is responsible for performing all work so that it meets or exceeds the <br /> standards established in Section 02133 Stormwater Pollution Prevention of Redwood <br /> City's Standard Technical Specifications. <br /> 2.4. Trenching and Backfill <br /> Contractor is responsible for performing all work so that it meets or exceeds the <br /> standards established in Section 02202 Trenching and Backfill of Redwood City's <br /> Standard Technical Specifications. <br /> 2.5. Removals, Grading, and Earthwork <br /> Contractor is responsible for performing all work so that it meets or exceeds the <br /> standards established in Section 02220 Grading and Earthwork of Redwood City's <br /> Standard Technical Specifications. <br /> Page 11 of 13 <br /> REV:10-19-16 RL <br /> ATTY/AGR.2016.300/Bay Area Paving Co., Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.