My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-10-24 Closed and Joint SA PFA HHCC
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-10-24 Closed and Joint SA PFA HHCC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 4:45:27 PM
Creation date
10/20/2016 5:13:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/24/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.1.E. - Page 15 <br /> EXHIBIT B - FEE SCHEDULE <br /> Payment Terms <br /> Contractor shall provide a detailed monthly invoice including: <br /> - City's Work Order reference number(from electronic management system) <br /> - Materials charge showing itemized breakdown of each material repaired / replaced / <br /> installed for the task(Materials charge=unit charge x quantity) <br /> - Separate line item for sales tax <br /> - Separate line item for any material mark up <br /> Each month, all invoices for work performed in the previous month shall be submitted to City <br /> staff, and will be made payable Net 30. Invoices that do not provide the details listed above will <br /> not be paid by the City. <br /> Unit Description of Item Unit Price Not to Exceed <br /> Amount <br /> SQ. <br /> 1. FT. Asphalt Pavement $ 8.00/sq ft $200,000.00 <br /> SQ. <br /> 2. FT. Concrete Sidewalk Repair/Wheelchair Ramp $ 14.00/sq ft $140,000.00 <br /> 3. LF Concrete curb and gutter $47.00/linear foot $ 21,500.00 <br /> SQ. <br /> 4. FT. Concrete Driveway Repair $ 16.00/sq ft $ 80,000.00 <br /> 5. LF Repair irrigation system $ 12.00/linear foot $ 6,000.00 <br /> 6. CY Additional sub-base excavation $ 100.00/cubic yard $ 20,000.00 <br /> 7. EA Drain line installation $40.00/each $ 8,000.00 <br /> 8. EA Traffic Control,Notification,and Other Incidentals $0.00/each $ 0.00 <br /> TOTAL $475,500.00 <br /> Page 13 of 13 <br /> REV:10-19-16 RL <br /> ATTY/AGR.2016.300/Bay Area Paving Co., Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.