My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-10-24 Closed and Joint SA PFA HHCC
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-10-24 Closed and Joint SA PFA HHCC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 4:45:27 PM
Creation date
10/20/2016 5:13:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/24/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.1.A. - Page 15 <br /> estimates, and other documents, including but not limited to, details, catalogue cuts and <br /> product literature for major products. <br /> 2. Prepare and submit draft pump station control strategy. <br /> 3. Perform SCADA system design. Provide draft SCADA strategy/programming report. <br /> Initiate PLC programming. Coordinate with the City. Five (5) sets of ninety percent (90%) <br /> plans, specification outline, and Engineer's Estimate shall be presented to the City for <br /> review. A single marked set will be returned along with City staffs comments and/or <br /> request for clarifications to the Consu Itant for revision. One meeting shall be scheduled with <br /> City staff after review of the 90% submittal prior to proceeding with the 100% Final Design <br /> Submittal. <br /> Deliverables: <br /> • 90% plans, specifications, and other items as outlined in Task 4.1,4.2, and 4.3 <br /> Assumptions: <br /> • Consultant's base effort and budget is based on using a factory pre-packaged pump <br /> station with submersible pumps with MCC and control panel, including precast wet well and <br /> valve box, , diesel generator with factory acoustical enclosure, and a manual trash rack in <br /> the manhole upstream of the pump station. <br /> TASK 5— FINAL DESIGN (100% DESIGN SUBMITTAL) <br /> The Consultant shall proceed with the Final Design and the preparation of the improvement <br /> plans and specifications, <br /> Consultant shall: <br /> 1. Incorporate 90% Design Submittal review comments. Prepare 100% Design Submittal <br /> consisting of complete construction documents including drawings, specifications and cost <br /> estimates. <br /> 2. The 100% Design Submittal shall include, but not limited to, demolition plan, site grading <br /> and piping plan, general and construction notes, connection details, electrical details, <br /> structural details, technical specifications, and estimate of construction costs. The design <br /> calculations and analysis should include all final engineering calculations, any <br /> miscellaneous technical data, and catalogue cuts for any special equipment. <br /> 3. Submit final control strategy report and final (tested) SCADA/PLC program. <br /> 4. The 100% Design Submittal shall be ready for signature and submitted to the City for <br /> review and approval. A marked set will be returned along with staffs comments and/or <br /> request for clarifications for revision. Consultant shall furnish one (1) set of full-size plans <br /> and specifications for the project. Both sets of documents shall bear the responsible <br /> engineer's wet stamp and signature with a license expiration date. Consultant shall also <br /> furnish an electronic copy of the drawings in AutoCAD (version 2004 or latest) and in PDF <br /> format, specifications in Word, and cost estimate. <br /> Deliverables: <br /> • Provide final design plans, specifications, and documents as outlines in Task 5.1 to 5.4 <br /> Assumptions: <br /> • Consultant's base effort and budget is based on using a factory pre-packaged pump station <br /> with submersible pumps with MCC and control panel, including precast wet well and valve <br /> box, diesel generator with factory acoustical enclosure, and a manual trash rack in the <br /> manhole upstream of the pump station. <br /> ATTY1AGR12012.208/CAROLLO FOR$218784 <br /> REV:12-20-12 VR <br /> Page 12 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.