My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-10-24 Closed and Joint SA PFA HHCC
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-10-24 Closed and Joint SA PFA HHCC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 4:45:27 PM
Creation date
10/20/2016 5:13:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/24/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.1.A. - Page 23 <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES AND FEE <br /> The City of Redwood City is resuming with the construction of the Bair Island Storm Pump Station Project. The <br /> Consultant shall provide the following new and additional services as needed during the construction phase of the <br /> project on a time and material basis up to the limit of Consultant's budget. <br /> TASK 7.0 Engineering Support Services during Construction <br /> Task 7.1 Review submittals, RFIs and Change Orders -- Consultant shall review a selected number of shop drawing <br /> submittals.RFIs and change orders as requested by the City.It is assumed that City staff or CM staff will review the <br /> remaining submittals,RFIs and change orders. Consultant shall provide services up to the limit of authorized budget <br /> for this task. <br /> Task 7.2 Provide Final Record Drawings -- Consultant shall prepare record drawings based on a single construction <br /> markup set of drawings provided by the City or City's construction manager. Consultant shall furnish one set of full <br /> size plans reproducible media. <br /> Task 7.3 PLC Startup -- Consultant shall provide PLC startup assistance up to the limit of authorized budget for this <br /> task. <br /> Task 7.4 Other Startup and Commissioning Assistance-- Consultant shall provide as needed technical assistance on <br /> commissioning and bringing online the new Bair Island Storm Pump Station. <br /> Task 7.5 Site Visits and Construction Meetings--Consultant shall make site visits and attend construction meetings as <br /> requested by the City. <br /> TASK 8.0 Additional Construction Issue Resolution <br /> Task 8.1 As Needed SVCW Force Main Resolution --Consultant shall provide as requested assistance to resolve any <br /> issues that arise with the result of the operation and decommissioning of SVCW's existing force main.. <br /> Task 8.2 As Needed Construction Problem Resolution and Assistance -- Consultant shall provide as requested <br /> assistance on other potential issues that may arise during construction of the new Bair Island Storm Pump Station and <br /> decommissioning of the existing pump station. <br /> Assumptions <br /> Consultant shall provide as requested engineering services during construction up to the limit of authorized budget. <br /> Estimated effort is based on an average level of effort and City staff and CM staff doing part of the work. Actual <br /> effort required may vary depending on the contractor, subcontractors, City and CM staff involvement, construction <br /> schedule and unforeseen site conditions and issues. <br /> FEE SCHEDULE <br /> Consultant's Services under this Amendment as set forth above are not to exceed$63,515.00. All fees shall be <br /> charged on a time and materials basis,commensurate with work completed and in accordance with hourly rates set <br /> forth in the table below. <br /> ATTY/AGR/2015/AMENDMENTS/AMEND NO.1—CAROLLO ENGINEERS,INC <br /> REV:10-23-15 VR <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.