My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-10-24 Closed and Joint SA PFA HHCC
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-10-24 Closed and Joint SA PFA HHCC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 4:45:27 PM
Creation date
10/20/2016 5:13:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/24/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.1.A. - Page 39 <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES AND FEE <br /> The Consultant shall provide the following engineering services during the construction phase of the Bair <br /> Island Storm Drain Pump Station project on a time and material basis up to the limit of Consultants <br /> budget. <br /> TASK 9.0 Engineering Support Services during Construction <br /> Task 9.1 Review submittals, RFIs and Change Orders -- Consultant shall review additional shop <br /> drawing submittals, RFIs and change orders as needed by the City. Consultant shall provide services up <br /> to the limit of authorized budget for this task. <br /> Task 9.2 Hazardous Waste Related CM Issues -- Consultant shall provide as requested hazardous <br /> waste related services by the City up to the limit of authorized budget. <br /> TASK 10.0 Additional Construction and Post-Construction Services <br /> Task 10.1 As Needed Construction and Post-Construction consulting— Special inspection, <br /> investigative and technical consulting services for the one-year contractor warranty period and as needed <br /> by the City <br /> Task 10.2 Review Manufacturer's Operation and Maintenance (O&M) Manual -- Consultant shall <br /> provide assistance in reviewing manufacturer's O& M manuals for pumps, VFDs, and diesel generator as <br /> requested up to the limit of authorized budget <br /> ASSUMPTIONS <br /> Consultant shall provide as requested engineering services during construction up to the limit of <br /> authorized budget. Estimated effort is based on an average level of effort and City staff and City' <br /> construction management (CM) consultant's staff doing part of the work. Actual effort required may vary <br /> depending on the contractor, subcontractors, City and CM staff involvement, construction schedule and <br /> unforeseen site conditions and issues. <br /> FEE SCHEDULE <br /> All fees shall be charged on a time and material basis, commensurate with work completed and in <br /> accordance with hourly rates set forth in the table below. <br /> ATTY/AGR/2016/AMENDMENTS/AMEND NO.2 CAROLLO ENGINEERS,INC. <br /> REV:09-30-16 VR <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.