My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 David J. Powers & Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 David J. Powers & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 11:57:06 AM
Creation date
10/21/2016 9:53:55 AM
Metadata
Fields
Template:
Agreement
Contractor Name
David J. Powers & Associates, Inc.
PROJECT NAME
Veterans Memorial Senior Center / YMCA Joint Project CEQA
RMP File Number
304
Date
10/21/2016
MO Ref
16-193, 17-089, 19-049
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br /> SCOPE OF SERVICES <br /> • Kick-off Meeting <br /> Upon initiation of the project, DJP&A will participate in a kick-off meeting with City staff. This meeting <br /> will be used to confirm the project schedule, work elements, and development assumptions, as well as <br /> confirm the data to be provided by the project team and necessary timing of that data relative to the <br /> overall schedule. The kick-off meeting will include DJP&A's historic consultant. <br /> • Noticing <br /> DJP&A will prepare the Notice of Preparation ( NOP) for the project, and file the NOP with the State <br /> Clearinghouse. The City will send the NOP to all other applicable parties and agencies. The City will <br /> prepare all other notices including the Notice of Availability, Notice of Completion, and Notice of <br /> Determination. During the NOP circulation period, DJP&A will attend a scoping meeting for the project. <br /> DJP&A will assist City staff to facilitate the meeting and will present the EIR process at the meeting. <br /> • Preparation of the Administrative Draft EIR <br /> DJP&A will prepare an Administrative Draft EIR (ADEIR). The ADEIR will include a preface/introduction, <br /> a summary, a description of the project and environmental setting, an in-depth discussion of potential <br /> significant impacts, identification of proposed and recommended mitigation measures, a discussion of <br /> cumulative impacts, project alternatives, and all other required discussions as described below. <br /> EIR Summary: A summary of the EIR will be prepared which will include a brief description of the <br /> proposed project. The summary will be prepared in tabular form and will identify the impacts of the <br /> project (including cumulative impacts) and proposed mitigation measures. The summary will also list <br /> the alternatives discussed and will address any known areas of public controversy. <br /> Project Description: Based on information provided to DJP&A by the City, the EIR will provide a detailed <br /> description of the proposed project, including the physical characteristics (grading and drainage, <br /> setbacks, lot layout, percentage of site coverage, maximum building height, landscaping/hardscape, <br /> circulation, etc.) of the development. This section will include a list of the project objectives, necessary <br /> discretionary actions, and decision-making agencies. Maps and graphics will be provided to illustrate <br /> the text. <br /> Consistency with Plans and Policies: This section will discuss the proposed project's consistency with <br /> applicable land use controls, including local, regional, and statewide plans and policies. Particular <br /> attention will be given to inconsistencies, if any are identified, and the likelihood that such <br /> inconsistencies might result in significant adverse environmental effects. <br /> Environmental Setting, Impacts and Mitigation Measures: In accordance with CEQA Guidelines Section <br /> 15125, the DR will clearly describe the baseline environmental setting of the project site and <br /> surrounding area based on conditions that exist at the time the NOP is released. For identified impacts, <br /> all feasible mitigation measures will be identified. Graphics will include, but are not limited to, regional <br /> ATTY/AGR/2016.258/DAVID J. POWERS & ASSOCIATES, INC. <br /> REV: 09-15-16 VR <br /> Page 9 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.