My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2016-099069 STMMA 50, 80 and 88 Finger Ave The Grove Lot 1
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2016-099069 STMMA 50, 80 and 88 Finger Ave The Grove Lot 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 3:38:30 PM
Creation date
10/25/2016 3:37:26 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA
Doc Num
2016-099069
Rec Date
9/27/2016
Address
STMMA 50, 80 and 88 Finger Ave The Grove Lot 1
Parties
Liberty Hall Lane Partners, LP
MO Ref
16-163
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "C" <br /> Biotreatment Area and Pervious Pavers Area Maintenance Plan for <br /> Lot 1 , "The Grove" Subdivision, Redwood City, CA <br /> August 16, 2016 <br /> w.: ..4 . `,_., Project Address and Cross Streets <br /> . <br /> .-` ` _ Lot 1 Liberty Hall Lane (near Finger Avenue) <br /> • U Ky <br /> �. • - <br /> .. <br /> . . '' Parcel No.: Lot 1 , `The Grove" <br /> +i <br /> .% - <br /> Property Owner: Liberty Hall Lane Partners LP <br /> Phone No.: (669) 231 -4240 <br /> Designated Contact: Eric Zweig <br /> . ...w ...,. Ia. <br /> . . —_: \._ Phone No.: (669) 231 -4240 <br /> Biotreatment areas function as soil and plant- <br /> based filtration devices that remove pollutants Mailing Address: 21771 Stevens Creek Blvd, <br /> through a variety of physical, biological, and Suite 200A, Cupertino, CA 95014 <br /> chemical treatment processes. These facilities <br /> normally consist of a grass buffer strip, sand bed, <br /> ponding area, organic layer or mulch layer, <br /> planting soil, and plants. <br /> The property contains 1 biotreatment area, 1 pervious pavers area for the walkway, and 1 <br /> pervious pavers area for the driveway, located as described below and as shown in the <br /> attached site plan' . <br /> al Biotreatment Area is located at the northerly corner of the property. <br /> ■ Pervious Pavers for Walkway is located at the northeasterly side of the property. <br /> ■ Pervious Pavers for Driveway is located at the northeasterly side of the property. <br /> I. Routine Maintenance Activities <br /> The principal maintenance objective is to prevent sediment buildup and clogging, which <br /> reduces pollutant removal efficiency and may lead to biotreatment area and pervious <br /> pavers area failure. Routine maintenance activities, and the frequency at which they will be <br /> conducted, are shown in Table 1 and Table 2. <br /> Table 1 <br /> Routine Maintenance Activities for Biotreatment Areas <br /> No. Maintenance Task Frequency of Task <br /> -1 Remove obstructions, debris and trash from biotreatment Monthly, or as needed after storm <br /> area and planter box and dispose of properly. events <br /> 2 Inspect biotreatment area and planter box to ensure that Monthly, or as needed after storm <br /> they drain between storms and within five days after events <br /> rainfall. <br /> ATTY/AGR.2016.225/Liberty Hall Lane Partners, LP - STMMA - Lot 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.