My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Cal-West Lighting and Signal Maintenance, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Cal-West Lighting and Signal Maintenance, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2022 4:03:49 PM
Creation date
10/26/2016 4:02:10 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Cal-West Lighting and Signal Maintenance, Inc.
PROJECT NAME
Lighting Maintenance services
RMP File Number
304
Date
10/26/2016
MO Ref
16-181, 19-123
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Electronic Reauest Management Svstem: <br />Contractor will continue to use myRWC, the City's electronic service request system, to <br />receive and respond to service requests from the public. Contractor is responsible for <br />responding to myRWC requests in a timely manner. <br />Preventative Monthly Maintenance (Routine): <br />1. Contractor will inspect signal controller and cabinet contents for proper <br />functioning. Contractor will: <br />a. Check general overall appearance of controller cabinet, type 3 service and <br />battery back-up cabinets (vacuum if necessary); <br />b. Check presence of signal cabinet wiring schematics and records; <br />c. Verify current signal controller timing -logs; <br />d. Verify programmed signal controller timing matches intersection timing - <br />logs; <br />e. Inspect signal controller and conflict monitor functioning in relation to <br />traffic; <br />f. Inspect loop detector amplifiers and tune if necessary; <br />g. Inspect video detection unit/camera alignment (if applicable); <br />h. Inspect load switches and relays; <br />i. Inspect light switches and ground -fault receptacles; <br />j. Inspect cabinet fan and thermostat; <br />k. Inspect battery back-up unit charging system (if applicable); <br />I. Inspect pre-emption system; <br />m. Inspect signal interconnect; <br />n. Inspect wire terminals for corrosion and integrity of all wire connections <br />(including battery back-up system battery terminals); <br />o. Inspect ground rod and grounding system for corrosion and integrity of <br />wire connections; <br />p. Inspect cabinet filter for cleanliness and serviceability and clean or <br />vacuum if necessary; <br />q. Inspect weather-proof gasket on controller cabinet and all other <br />associated cabinets; and <br />r. Inspect hinges and door locking mechanisms and lubricate if needed. <br />2. Contractor will inspect intersection for proper functioning, including inspecting: <br />a. Vehicular signals for alignment, paint, outages, bent, broken, corroded <br />hardware; <br />b. Pedestrian signals and audibles for alignment, paint, outages, bent, <br />broken, corroded hardware; <br />c. Pedestrian push -buttons for signal controller actuation and bent, broken, <br />corroded hardware, <br />d. Signal poles for paint, dents, or cracks and missing hand hole covers; <br />e. Pull -boxes for cracked, broken or missing lids; and <br />f. Loops in roadway for exposed, tom or broken wires. <br />3. Contractor will record date and time along with findings and work performed. <br />Preventative Semi -Annual Maintenance (coincides with monthiv): <br />REV: 07-24-17 MI <br />Page 4 of 6 <br />ATTY/AGR.Amend No. 1 /Cal -West Lighting and Signal Maintenance <br />
The URL can be used to link to this page
Your browser does not support the video tag.