My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Cal-West Lighting and Signal Maintenance, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Cal-West Lighting and Signal Maintenance, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2022 4:03:49 PM
Creation date
10/26/2016 4:02:10 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Cal-West Lighting and Signal Maintenance, Inc.
PROJECT NAME
Lighting Maintenance services
RMP File Number
304
Date
10/26/2016
MO Ref
16-181, 19-123
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCOPE OF WORK AND FEE <br />I. Scope of Work <br />Contractor will furnish all labor, tools, equipment, and materials necessary to perform <br />services needed to properly maintain the traffic signals and street lighting owned by the <br />City. <br />Contractor will provide 24-hour emergency phone service and have technicians <br />available 24 -hours per day, seven days per week to respond to all emergency calls in a <br />timely manner, meeting or exceeding the response standards described below. <br />Traffic Signals <br />1 Emergency and accident response One (1 ) Hour or less <br />2 Outages and signal malfunctions Two 2 Hours or less <br />3 Replacement of burned out signal lamps Two (2) Hours or less <br />4 1 Safety street -lighting Forty-eight (48) Hours or less <br />Street -Lighting: <br />1 Emergency and accident response One (1) Hour or less <br />2 Outages or malfunctions Forty-eight (48) Hours or less <br />Permanent repair work generated from normal maintenance and emergency response <br />will be completed as soon as possible, and in all cases within twenty-one (21) calendar <br />days or less, unless extended in writing by the Public Works Superintendent. <br />Signal Turn -Off and Sinal On Flash: <br />Contractor will immediately notify the City's Police Department and Public Works <br />Department of any signal turn-offs or signal -on -flash necessitated by Contractor's <br />operations in excess of fifteen (15) minutes. <br />?$ ,are Ep�uioment: <br />Contractor will maintain adequate storage and shop facilities and a sufficient stock of <br />fully tested controllers, spare parts and signal equipment to effectively maintain the <br />City's traffic signals. <br />Salvaged Equipment: <br />Contractor will either hold in Contractor's shop and storage facilities, or deliver to a <br />location designated by the City, any salvageable equipment or materials per the <br />direction of the Public Works Superintendent or Public Works Director. Contractor is <br />responsible for properly disposing any equipment declared non -salvageable by the City. <br />Consultation: <br />Contractor will provide traffic engineering review of traffic signal plans as requested by <br />the City. <br />REV: 05-23-18 MI <br />Page 3 of 6 <br />ATTY/AGR.Amend No. 2 /Cal -West Lighting and Signal Maintenance <br />
The URL can be used to link to this page
Your browser does not support the video tag.