Laserfiche WebLink
Contractor will: <br />1. Rotate back-up batteries. <br />2. Take voltage measurements from back-up batteries. <br />3. Test battery back-up by disconnecting PG&E power at service cabinet. <br />4. Check ground rod clamp and wire. <br />5. Visually check integrity of wire splices. <br />6. Adjust all mast arm mounted street name signs as needed. <br />7. Record date and time along with findings and work performed. <br />Preventative Annual Maintenance (coincides with monthlv and semi-annual): <br />Contractor will: <br />1. Inspect utility electrical service cabinet hardware supplying power to signal <br />controller cabinet. <br />2. Vacuum and clean signal controller cabinet, electrical service cabinet, and <br />battery back-up system cabinet (if applicable). <br />3. Take voltage measurements at service inputs to signal controller cabinet from <br />utility service feed. <br />4. Take voltage measurements at battery back-up system inputs from utility service <br />feed (if applicable). <br />5. Take voltage measurements at service inputs to signal controller cabinet from <br />battery back-up system (if applicable). <br />6. Check for water accumulation and duct sealant as necessary. <br />7. Replace signal cabinet filter if nylon -mesh type. <br />8. Vacuum and clean signal cabinet filter if aluminum -mesh type. <br />9. Inspect hinges and locking mechanisms on all signal associated cabinets and <br />lubricate if needed. <br />10. Record date and time along with findings and work performed. <br />II. Fee Schedule <br />Contractor shall provide the services outlined above on a per task basis not to exceed <br />$363,825. Fees will be billed based on actual hours and materials used per the rate <br />schedule as delineated below. <br />Traffic Signal Maintenance and Repair <br />REV: 05-23-15 MI <br />Page 5 of 6 <br />ATTY/AGR.Amend No. 2 /Cal -West Lighting and Signal Maintenance <br />Description <br />Unit <br />Unit Price <br />Frequency <br />1. <br />Monthly Preventative <br />Traffic Signal <br />$70.00 / signal <br />Monthly <br />Maintenance (PM) <br />2. <br />Semi -Annual PM (includes <br />Traffic Signal <br />$70.00 / signal <br />Semi -Annual <br />monthly) <br />3. <br />Annual PM (includes semi- <br />Traffic Signal <br />$70.00 / signal <br />Annual <br />annual) <br />Street Light Maintenance and Repair <br />Description <br />Unit <br />Unit Price <br />Frequency <br />1. <br />Routine Maintenance <br />Street Light <br />$1.15 / light <br />Monthly <br />2. <br />Quarterly Night Surveys <br />Hour <br />Included <br />Quarterly <br />REV: 05-23-15 MI <br />Page 5 of 6 <br />ATTY/AGR.Amend No. 2 /Cal -West Lighting and Signal Maintenance <br />