Laserfiche WebLink
Exhibit A <br />SCOPE OF SERVICES AND FEE <br />I. Scope of Work <br />Contractor will furnish all labor, tools, equipment, and materials necessary to perform <br />services needed to properly maintain the traffic signals and street lighting owned by the <br />City. <br />Contractor will provide 24-hour emergency phone service and have technicians available <br />24 -hours per day, seven days per week to respond to all emergency calls in a timely <br />manner, meeting or exceeding the response standards described below. <br />Traffic Signals: <br />1 <br />Emergency and accident response <br />One <br />1 <br />Hour or less <br />2 <br />Outages and signal malfunctions <br />Two.(2) <br />Hours or less <br />3 <br />Replacement of burned out signal lams <br />Two <br />2 <br />Hours or less <br />4 <br />Safety street -lighting <br />Forty-eight <br />48 Hours or less <br />Stre <br />1 Emergency and accident response One (1) Hour or less <br />2 Outages and malfunctions Fortv-eiaht (48) Hours or less <br />Permanent repair work generated from normal maintenance and emergency response <br />will be completed as soon as possible, and in all cases within twenty-one (21) calendar <br />days or less, unless extended in writing by the Public Works Superintendent. <br />Signal Turn -Off and Signal On Flash: <br />Contractor will immediately notify the City's Police Department and Public Works <br />Department of any signal turn-offs or signal -on -flash necessitated by Contractor's <br />operations in excess of fifteen (15) minutes. <br />Sure Equipment: <br />Contractor will maintain adequate storage and shop facilities and a sufficient stock of fully <br />tested controllers, spare parts and signal equipment to effectively maintain the City's <br />traffic signals. <br />Salvaged Equipment: <br />Contractor will either hold in Contractor's shop and storage facilities, or deliver to a <br />location designated by the City, any salvageable equipment or materials per the direction <br />of the Public Works Superintendent or Public Works Director. Contractor is responsible <br />for properly disposing any equipment declared non -salvageable by the City. <br />Consultation - <br />Contractor will provide traffic engineering review of traffic signal plans as requested by <br />the City. <br />REV: 05-13-2020 MI <br />ATTY/AGR.Amend No. 4/Cal-West (Page 4 of 7) <br />