My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 PlaceWorks
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 PlaceWorks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 8:46:11 AM
Creation date
10/26/2016 4:03:04 PM
Metadata
Fields
Template:
Agreement
Contractor Name
PlaceWorks
PROJECT NAME
Broadway Plaza Mixed Use EIR
RMP File Number
304
Date
10/26/2016
MO Ref
16-179, 18-184
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF REDWOOD CITY <br /> BROADWAY PLAZA MIXED - USE PROJECT EIR <br /> EXHIBIT A : SCOPE OF WORK AND COSTS <br /> project. On the basis of responses from public service providers, PlaceWorks will <br /> analyze potential impacts resulting from the project, and recommend mitigation <br /> measures as needed. A Water Supply Assessment (WSA) will be required for the <br /> proposed project. This scope of work assumes that the WSA will be prepared under <br /> a separate contract with the City. The utilities analysis in the EIR will reference the <br /> findings of the WSA. PlaceWorks is able to obtain a subconsultant to prepare the <br /> WSA, if requested by the City. <br /> Task C. Alternatives Analysis <br /> Building from the discussion of alternatives at the kick-off meeting, PlaceWorks will <br /> develop a list of up to three draft alternatives, including the CEQA-required No Project <br /> Alternative. We will work with City staff to finalize the list of alternatives, and then <br /> complete an impact analysis of each alternative. The alternatives analysis will be a <br /> qualitative discussion and will identify the environmentally superior alternative. The <br /> alternatives will be designed to avoid potentially significant impacts identified in Task B <br /> and could include a reconfigured site plan or lowered density alternative. This scope of <br /> work assumes that, under a separate contract with the City, Hexagon Transportation <br /> Consultants will provide an evaluation of transportation and traffic impacts for the three <br /> alternatives, <br /> Task D. Administrative Draft EIR <br /> PlaceWorks will prepare an ADEIR and submit it electronically to City staff for review and <br /> comment. The impact analysis will be comprehensive and cover all CEQA requirements. <br /> The ADEIR will include a section summarizing resource categories scoped out of the EIR <br /> and providing justification and citations in support of this determination, Significance <br /> criteria will be identified for each impact topic based upon thresholds of significance <br /> identified in Appendix G, Environmental Checklist Form, of the State CEQA Guidelines and <br /> identified in the scoping process. <br /> Impacts and mitigation measures will be organized and discussed by topic. For each <br /> identified environmental impact, a set of feasible mitigation measures will be <br /> recommended. <br /> The ADEIR will cover the following topics: <br /> • Executive Summary. PlaceWorks will create a summary in a form consistent with <br /> CEQA Guidelines Section 15123. This summary will facilitate a quick understanding <br /> of environmental issues and the actions required to mitigate potential impacts. It <br /> will include a summary table of impacts, mitigation measures, and levels of <br /> significance before and after mitigation. <br /> • Project Description. The ADEIR will include the project description drafted for the <br /> project as part of Task A.2, Project Description. <br /> • Setting, Impacts, and Mitigation Measures. The existing setting information, impact <br /> analyses, and mitigation measures developed in Task B will be combined to create <br /> chapters describing environmental consequences for each CEQA-required topic. <br /> PLACEWORKS 6 <br /> ATTY/AGR.2016.251/Placeworks AUGUST 31, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.