San Mateo County Hazard Mitigation Plan
<br />
<br />300
<br />SECTION 2 - Chapter 15
<br />City of Redwood City
<br />TABLE 15-9. HAZARD MITIGATION ACTION PLAN MATRIX
<br />Applies to
<br />new or
<br />existing
<br />assets Hazards Mitigated
<br />Objectives
<br />Met Lead Agency
<br />Estimated
<br />Cost Sources of Funding Timeline
<br />Action RC-12—Where feasible, implement a program to record high water marks following high-water events.
<br />New and
<br />existing
<br />Flooding, Severe
<br />Weather
<br />1, 3, 4, 5, 6 Redwood City Medium General Fund;
<br />FEMA Grant Funds
<br />(Public Assistance)
<br />Long-term
<br />Action RC-13—Integrate the hazard mitigation plan into other plans, programs, or resources that dictate land use
<br />or redevelopment.
<br />New and
<br />existing
<br />All 1, 2, 3, 4, 5,
<br />6, 7, 8, 10
<br />Redwood City Low General Fund Short-term
<br />Action RC-14—Improve the recycled water system as outlined in Phase II.A and Phase II.B Pipeline Alignment
<br />Study to alleviate demand on the domestic water system during times of drought.
<br />Existing Drought 1, 4, 5, 6 Redwood City
<br />Public Works
<br />High General Fund,
<br />Federal and State
<br />Grants
<br />Long-term
<br />Action RC-15—Continue to evaluate the City’s stormwater drainage and pumping system to determine upgrades
<br />to mitigate flooding conditions.
<br />Existing Flooding, Severe
<br />Weather
<br />1, 3, 4, 5, 7 Redwood City
<br />Public Works,
<br />Engineer
<br />Low General Fund Ongoing
<br />Action RC-16—Upgrade and add sanitary sewer lines in accordance with the 2013 Sewer System Master Plan to
<br />add capacity and redundancy, while reducing the risk of major service blockage.
<br />New and
<br />existing
<br />Flooding,
<br />Earthquake
<br />1, 3, 4, 5, 7,
<br />11
<br />Redwood City
<br />Public Works,
<br />Engineer
<br />Medium /
<br />High
<br />General Fund,
<br />FEMA Hazard
<br />Mitigation Grants
<br />Short-term
<br />Action RC-17—Seek opportunities to improve upon or exceed minimum standards regarding defensible space,
<br />where able and appropriate.
<br />N/A Wildfire 1, 4, 5, 6, 7 Redwood City
<br />Public Works, Fire
<br />Medium General Fund Ongoing
<br />Action RC-18—Conduct engineering study on Fire Station 12 to test seismic stability and other hazard-related
<br />structural standards.
<br />Existing Earthquake 1, 2, 3, 4 6,
<br />7
<br />Redwood City
<br />Engineer, Fire
<br />Medium General Fund,
<br />FEMA Hazard
<br />Mitigation Grants
<br />Short-term
<br />Action RC-19—Implement recommendations provided by Fire Station 12 study.
<br />Existing Earthquake 1, 2, 3, 4 6,
<br />7
<br />Redwood City
<br />Engineer, Fire
<br />Medium /
<br />High
<br />General Fund,
<br />FEMA Hazard
<br />Mitigation Grants
<br />Long-term
<br />Action RC-20—Conduct engineering study on Public Works building to test seismic stability and other hazard-
<br />related structural standards.
<br />Existing Earthquake 1, 2, 3, 4 6,
<br />7
<br />Redwood City
<br />Engineer, Public
<br />Works
<br />Medium General Fund,
<br />FEMA Hazard
<br />Mitigation Grants
<br />Short-term