Laserfiche WebLink
San Mateo County Hazard Mitigation Plan <br /> <br />300 <br />SECTION 2 - Chapter 15 <br />City of Redwood City <br />TABLE 15-9. HAZARD MITIGATION ACTION PLAN MATRIX <br />Applies to <br />new or <br />existing <br />assets Hazards Mitigated <br />Objectives <br />Met Lead Agency <br />Estimated <br />Cost Sources of Funding Timeline <br />Action RC-12—Where feasible, implement a program to record high water marks following high-water events. <br />New and <br />existing <br />Flooding, Severe <br />Weather <br />1, 3, 4, 5, 6 Redwood City Medium General Fund; <br />FEMA Grant Funds <br />(Public Assistance) <br />Long-term <br />Action RC-13—Integrate the hazard mitigation plan into other plans, programs, or resources that dictate land use <br />or redevelopment. <br />New and <br />existing <br />All 1, 2, 3, 4, 5, <br />6, 7, 8, 10 <br />Redwood City Low General Fund Short-term <br />Action RC-14—Improve the recycled water system as outlined in Phase II.A and Phase II.B Pipeline Alignment <br />Study to alleviate demand on the domestic water system during times of drought. <br />Existing Drought 1, 4, 5, 6 Redwood City <br />Public Works <br />High General Fund, <br />Federal and State <br />Grants <br />Long-term <br />Action RC-15—Continue to evaluate the City’s stormwater drainage and pumping system to determine upgrades <br />to mitigate flooding conditions. <br />Existing Flooding, Severe <br />Weather <br />1, 3, 4, 5, 7 Redwood City <br />Public Works, <br />Engineer <br />Low General Fund Ongoing <br />Action RC-16—Upgrade and add sanitary sewer lines in accordance with the 2013 Sewer System Master Plan to <br />add capacity and redundancy, while reducing the risk of major service blockage. <br />New and <br />existing <br />Flooding, <br />Earthquake <br />1, 3, 4, 5, 7, <br />11 <br />Redwood City <br />Public Works, <br />Engineer <br />Medium / <br />High <br />General Fund, <br />FEMA Hazard <br />Mitigation Grants <br />Short-term <br />Action RC-17—Seek opportunities to improve upon or exceed minimum standards regarding defensible space, <br />where able and appropriate. <br />N/A Wildfire 1, 4, 5, 6, 7 Redwood City <br />Public Works, Fire <br />Medium General Fund Ongoing <br />Action RC-18—Conduct engineering study on Fire Station 12 to test seismic stability and other hazard-related <br />structural standards. <br />Existing Earthquake 1, 2, 3, 4 6, <br />7 <br />Redwood City <br />Engineer, Fire <br />Medium General Fund, <br />FEMA Hazard <br />Mitigation Grants <br />Short-term <br />Action RC-19—Implement recommendations provided by Fire Station 12 study. <br />Existing Earthquake 1, 2, 3, 4 6, <br />7 <br />Redwood City <br />Engineer, Fire <br />Medium / <br />High <br />General Fund, <br />FEMA Hazard <br />Mitigation Grants <br />Long-term <br />Action RC-20—Conduct engineering study on Public Works building to test seismic stability and other hazard- <br />related structural standards. <br />Existing Earthquake 1, 2, 3, 4 6, <br />7 <br />Redwood City <br />Engineer, Public <br />Works <br />Medium General Fund, <br />FEMA Hazard <br />Mitigation Grants <br />Short-term <br />6.3.B. - Page 27