My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-05-06
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:52:46 PM
Creation date
5/3/2002 8:37:24 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
5/6/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
approximately 185' North of Middlefield Road to Stambaugh Street and join to the <br /> existing pavements of Stam~ ~ ~gh St: ~et. The construction includes the complete <br /> removal of the existing roadw y', the ;~iacement of new Class 2 Aggregate Base, asphalt <br /> pavement, the construction of concrete curb, gutter and sidewalk on both sides of the <br /> street, pavement marking, signing and striping, construct a storm drain system for <br /> Willow Street including a drainage system for existing properties with frontage on both <br /> sides of Willow Street located between 2233 Middlefield Road and Stambaugh Street. <br /> All work shall be designed and constructed in accordance with Redwood City Standards <br /> and Ordinances. Owner may, at its option, pay City an Improvement Fee in the amount <br /> of $124,931.00, or proceed with the performance of the above referred improvements. <br /> The Improvement Fee shall be paid at the time of Foundation Building Permit issuance. <br /> <br />Exhibit-Agmt-450113001 <br />FXS/dr 2 <br />02/04/02R, 02/12/02R <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.