Laserfiche WebLink
b. Excavation - 1500Y @ $20.00 3,000_ <br /> c. Curb and Gutter removal - 60 LF I~ $7.00 420 <br /> d. Sidewalk removal - 60 LF ~ $4.00 240 <br />2 Storm Drain <br /> a. 12" RCP, Class V - 130 LF ~ $70.00 9,100 <br /> b. Curb inlet - 2 EA ~ $3,000 6,000 <br /> c. 6" PVC encased - 150 LF ~ $50.00 7,500 <br /> d. Area drain box - 3 EA ~ $800 2,400 <br />3 Water works (Fire Hydrants & relocations, water meter 4,000 <br /> boxes) <br />4 Pavement including subgrade preparation <br /> a. 4" AC over 12" A.B. - 5,600 SF (~ $5.00 28,000 <br /> b. Transition and overlay @ Stambaugh L.S. 800 <br />5 Concrete Curb and Gutter - 300 LF ~ $17.00 5,100 <br />6 Concrete Sidewalk - 1,500 SF ~ $3.00 4,500 <br />7 Wheelchair Ramp - 2 EA ~ $700 1,400 <br />8 Signing, striping and marking L.S. ~ 3,000 <br />9 Pole relocation - 2 EA t~ $1,500 3,000 <br />10 Street trees - Landscaping 6,500 <br /> Sub-total $95,835 <br /> 10% Contingencies 9,584 <br /> 105,419 <br /> 10% Engineering & Staking 10,542 <br /> SUB-TOTAL 115961 <br /> Permit Cost (Plan Check and Inspection) 8,970 <br /> GRAND TOTAL $124,931 <br /> <br /> <br />