My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Bay Area Paving Co., Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Bay Area Paving Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2016 8:53:44 AM
Creation date
11/23/2016 8:36:07 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Bay Area Paving Co., Inc.
PROJECT NAME
Utility Trench Repair Work
RMP File Number
304
Date
11/21/2016
MO Ref
16-202
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.5. Utility Clearance <br /> The Contractor is responsible for performing a dig notification (e.g. USA North 811 <br /> http://usanorth811 .org/) prior to commencing any trench or excavation work. <br /> Contractor is charged with knowledge of all subsurface conditions reflected in USA <br /> records. <br /> The cost of all of the following will be included in the Contract Sum and Contractor <br /> shall have full responsibility for (a) reviewing and checking all available information <br /> and data including, but not limited to, information made available for bidding and <br /> information on file at USA; (b) locating all Underground Facilities using available <br /> information, indicated by visual observation, engaging qualified locating services and <br /> all necessary backhoeing and potholing; (c) coordination of project activities with the <br /> owners of such Underground Facilities during construction; and (d) the safety and <br /> protection of all such Underground Facilities and repairing any damage thereto <br /> resulting from Contractor's activities. <br /> 1. 6. Public Notification <br /> Contractor will hand deliver notices to residents prior to starting any construction <br /> activities. Contractor will notify all residents in the surrounding project area at least <br /> 24 hours before any special extended noisy and dusty period of construction. <br /> 1. 7. Water and Dust Control <br /> All water used in conjunction with the project shall be metered and paid for by the <br /> Contractor. Contractor will need to pay a construction meter deposit at the Revenue <br /> Services Counter at City Hall (1017 Middlefield Rd) prior to checking out a <br /> construction meter at the Public Works Services Department ( 1400 Broadway St). <br /> Contractor shall take appropriate steps, such as watering, to prevent airborne dust due <br /> to work under this contract. Contractor shall remove and dispose daily at his cost, <br /> off-site of dirt, debris, waste and rubbish from the work area and construction site. <br /> 1. 8. Utility Shutdown <br /> No utility shall be disconnected without prior written approval of City staff. In the <br /> event operations of this project require that there be a temporary utility shutdown, the <br /> Contractor shall submit to the City, in writing, notice of this requirement at least <br /> forty-eight hours in advance of operation. <br /> 1. 9. General Traffic Control <br /> Contractor shall adhere to the traffic regulations of the City's Engineering Standards. <br /> At a minimum, Contractor shall provide one 10-foot minimum width traffic lane for <br /> vehicular traffic in each direction of travel during construction. <br /> 1010. Staging Area and Use of City Streets <br /> Material storage shall be limited at the construction site to what is needed for two <br /> days construction. Contractor is responsible for making his own arrangements, for <br /> Page 8 of 13 <br /> REV: 10-19-16 RL <br /> ATTY/AGR.201 6.300/Bay Area Paving Co., Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.