My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-08-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-08-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:50:18 PM
Creation date
8/19/2004 1:45:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/23/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ~. 6-11 <br /> Consultant shall coordinate the work between various disciplines and with the <br /> subconsultants through 6 in-house project status meetings. <br /> Task 1.3 - City Progress Meetings <br /> Consultant shall coordinate the work with the City through meetings and <br /> correspondence. It is anticipated that 6, two-hour-Iong project status/coordination <br /> meetings will be conducted with the City over a 12-month period. Consultant's project <br /> manager will attend each meeting. Kennedy/Jenks's project engineer and selected <br /> subconsultant representatives may also attend specific meetings at the request of the <br /> Kennedy/Jenks's project manager, depending upon project activity. It is also <br /> anticipated that Consultant will participate in periodic conference calls throughout the <br /> project, up to one 30 minute conference call every other week. <br /> Task 1.4 - QAlQC Program <br /> Consultant shall develop and execute a Quality Assurance/Quality Control (QAlQC) <br /> Program specific to this project. Quality reviews will be conducted prior to the <br /> Preliminary, 90%, and 100% submittals. <br /> Task 1.5 - Schedule <br /> Consultant shall prepare a gantt chart schedule for design and construction. The <br /> schedule format will be coordinated with the City's program manager. The schedule will <br /> be updated monthly and will be submitted along with the monthly invoices. <br /> Task 2 - Preliminary Design <br /> Consultant shall provide the following work which constitutes a preliminary level of <br /> design development: <br /> 1. Research and obtain utility record drawings and other pertinent right-of-way and <br /> utility information. City will coordinate access to City files. <br /> 2. Perform field investigations of the proposed pipeline alignment, including up to 3 <br /> days of walking the alignment with City staff. <br /> 3. Identify utility conflicts along the proposed alignment, and identify up to 60 utility <br /> locations for potholing. <br /> 4. Review existing geotechnical investigations provided by City, and incorporate the <br /> City's standard pipe installation and corrosion protection details into the design. Per <br /> the City's request, neither a geotechnical investigation nor a corrosion evaluation will <br /> be conducted for this project. <br /> 5. Coordinate surveying and mapping to be performed by our subcontractor, Mark <br /> Thomas & Company: <br /> Agreement over $10K 15 <br /> KennedyJenks Rev-2 112603 <br />. - - - - -»., . < '. --'-'~~'-....~,.,... .....~.__.,,-,...._.._- <-.-............,' <br />
The URL can be used to link to this page
Your browser does not support the video tag.