My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-08-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-08-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:50:18 PM
Creation date
8/19/2004 1:45:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/23/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 1· (}13 <br />f. Summary of Surge Evaluation and Surge Protection Facilities <br />g. Draft Standard Details and Typical Profile Sheet <br />h. Preliminary Cost Estimate <br />14. Participate in a Preliminary Design Review Meeting with City staff. <br />Task 3 - Ninety Percent Design <br />Consultant shall provide the following work which constitutes a 90% level of design <br />development: <br />1. Coordinate potholing activities at up to 60 locations. <br />2. Prepare plan and profile drawings for the distribution pipelines at 1 II = 20'. <br />3. Prepare plan and profile drawings for up to 72 service laterals at 1" = 20'. <br />4. Prepare other drawings, such as cover sheet and details for the Project. <br />5. Prepare pipeline trench cross-sections (up to 10 each) with respect to adjacent <br />utilities for review by the City. <br />6. Incorporate service locations to customer sites provided by the site retrofit team. <br />7. Submit draft sets of drawings for City review up to four times prior to completion of <br />the 90% design. <br />8. Prepare contract documents including City front-end documents, bid list, City and <br />Engineer technical specifications and other related documents for bid-build. <br />9. Incorporate environmental mitigation measures into Project plans and specifications. <br />10. Prepare 90% Design Engineer's cost estimate. <br />11. Provide 10 copies of a 90% submittal of final design for City review, including: <br />a. Half-size Drawings; <br />b. Contract Documents; and <br />c. Construction cost estimate and schedule. <br />12. Participate in a 90% Review Meeting with City staff. <br />Task 4 -100% Design <br />After incorporating the City's 90% review comments, Consultant shall submit 10 copies <br />of a 100% submittal including cost estimate, design drawings and contract documents <br />for City's final review. After receiving City approval of the 100% submittal from City, the <br />Consultant shall deliver the following documents: <br />Agreement over $10K 17 <br />KennedyJenks Rev-2 112603 <br />- - - ,.- _.... ....".."_w___. .... ..~........ ._.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.