My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Recycled Water (S... (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Recycled Water (S... (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2014 2:52:28 PM
Creation date
8/24/2004 8:59:37 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority SBSA
PROJECT NAME
production & delivery of recycled water
RMP File Number
802
Date
8/1/2004
MO Ref
04-152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SBSA and City, as producer and distributor of Recycled Water, respectively, <br /> agree that the responsibilities shall be allocated as described on Attachment Four. <br /> The Parties intend that this Agreement satisfy the requirement in RWQCB <br /> General Order 96-011.C.1,but agree to provide additional supplementary <br /> information to RWQCB if and as required, <br /> 4.0 OTHER PRECONSTRUCTION ACTIVITIES AND AWARD OF CONTRACT(S) <br /> TO CONSTRUCT FACILITIES <br /> 4.1 Facilities on SBSA Property <br /> The following provisions apply to the award of contract(s) for construction of <br /> facilities located on SBSA's property. <br /> 4.1.1 Preparation of Final Construction Contract and Bidding Document <br /> SBSA, with the assistance of the Covello Group, Inc. or another qualified <br /> engineering firm approved by City, will develop construction schedules, <br /> perform constructability reviews of design documents,prepare materials <br /> to use for pre-qualification of contractors, evaluate purchase of long lead- <br /> time construction materials, and other necessary pre-construction <br /> activities. No materials will be purchased by SBSA without prior written <br /> approval by City of the contract terms and price. <br /> 4.1.2 Approval of Construction Contract Documents <br /> The final Construction Contract Documents(including plans, <br /> specifications, general conditions, special provisions, instructions to <br /> bidders,proposal forms, etc.)will be prepared by or for SBSA in close <br /> coordination with City. They will include the provisions of the SBSA <br /> Standard Specifications (September 2003 rev.1), including the <br /> requirement that the Construction Contractor comply with all provisions <br /> -7- 1091374.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.