Laserfiche WebLink
6.1.A. - Page 14 <br />A. <br />B. <br />EXHIBIT "A" <br />SCOPE OF SERVICES <br />PROJECT DESCRIPTION <br />The 'City of Redwood City (City) seeks to improve the concrete lined sections of <br />Redwood Greek in connection with the 2017 Redwood Creek Improvement <br />Project. Over time, some sections of concrete lined channels and box culverts <br />developed deficiencies such as cracking, spalling, exposed, damaged and/or <br />corroded reinforcing steel, joint filler deterioration, horizontal/vertical joint <br />displacements, and wall rotations. The City would like to repair and rehabilitate <br />these concrete structures to improve their conditions. This project is the first <br />improvement project for the first year of a multi-year repair and rehabilitation <br />program. This project involves the engineering and construction services by a <br />qualified engineering consulting firm. The Consultant will prepare the plans and <br />specifications, cast estimates, contract documents for bidding, provide bid <br />support and construction services and prepare the final as -built drawings. <br />SCOPE OF WORK <br />In 2012, the City contracted with BKF Engineers to document deficiencies of the <br />Redwood Creek and its four tributaries. As a result, the City obtained permits <br />from the US Army Corps of Engineers, California Regional Water Quality Control <br />Board, and California Department of Fish and Wildlife to work on the improved <br />portions of Redwood Creek. Upon review and evaluation of identified deficiencies <br />from 2012 as well as recent creek walks with Public Works personnel, <br />Engineering staff selected two sections, denoted Reach 1 and Reach 2, of <br />Redwood Creek for this project. <br />The following are some issues and deficiencies that need to be addressed for the <br />selected reaches of the Project. These are deficiencies previously identified by <br />the City's consultant in 2012 for the Redwood Creek Deficiency Review report. <br />Some additional photos and deficiencies identified in September 2016 by City <br />staff have also been included and denoted with an asterisk (*). <br />Reach 1 (Jefferson Branch): <br />waypoint I Observation Notes I Ref. Photos I Channel Lining <br />JEFFERSON BRANCH (Approx. 951D LF between Clinton Stet and El Camino Real) <br />concrete rectangular <br />JE -232 � North face section rotating forward T 700^ 701N charme! <br />? 7S5tit� ; <br />iconcrete rec anquiar <br />Jim -233 � Notth tatC.v SeCti r, rctaVrg tosvmra 2" 705N 7014 cfaanrse£ <br />4 <br />aQ l2o report), 5" in Sept 20 6 � .e- & 6335 i <br />i';f'J: 12Y)9 -1r, RL <br />Page 10 of 23 <br />ATTYWAGR.2016.325Nvood Rodgers, trio. <br />