My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-12-12 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-12-12 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2017 5:17:37 PM
Creation date
12/8/2016 5:27:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minutes
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/12/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2.A. - Page 12 <br />(3) Developer is adjudged bankrupt or makes a general assignment for the benefit of <br />creditors, or a receiver is appointed in the event of Developer's insolvency. <br />(4) Developer or Developer's contractors, subcontractors, agents or employees, fail <br />to comply with any terms or conditions of this Agreement. <br />(5) Any delay in the construction of any portion of the Work or repairs, which in the <br />reasonable opinion of the City Engineer, endangers public or private property. <br />City shall serve written notice of breach and default under this Agreement upon Developer and the <br />financial institution holding the securities. <br />24. Omiortrmity to Cure. If City gives Developer notice under Section 23 of breach and <br />default of this Agreement, Developer shall have 30 days within which to correct, remedy or cure the <br />default. If the written notification states that the problem is urgent and relates to the public health and <br />safety, then Developer shall have 24 hours to correct, remedy or cure the default. if Developer does not <br />cure the default within the applicable timeframe, City may pursue the remedies set forth in Section 25 <br />below. <br />25. Remedies. <br />25.1 City may proceed to complete the Work by contract or other method City <br />considers advisable, at the sole expense of Developer. Developer, immediately upon demand, <br />shall pay the costs and charges related to the Work and any subsequent repairs. City, without <br />liability for doing so, may take possession of and utilize in completing the Work and repairs, if <br />any, such materials and other property belonging to Developer as may be on or about the Property <br />and necessary for completion of the work. In the event of default, the financial institution holding <br />the securities shall be liable to City to pay the face amount of the security, as specified under <br />Section 13. <br />252 City may bring legal action to compel performance of this Agreement and <br />recover the costs of completing the Work and/or repairs, if any, including City's administrative <br />and legal costs or pursue any other action at law or equity. <br />253 If legal action is brought by City under this section of the Agreement, and City is <br />the prevailing party in such a proceeding, Developer shall pay all of the costs of suit, reasonable <br />attorney fees, arbitration costs and such other costs as may be determined by the court or <br />arbitrator. <br />25A No failure on the part of City to exercise any right or remedy hereunder shall <br />operate as a waiver of any other right or remedy that City may have hereunder. <br />25.5 The rights and remedies of City are cumulative, and the exercise by City of one <br />or more of such rights or remedies shall not preclude the exercise by it, at the same or different <br />times, of any other rights or remedies for the same default or any other default. <br />26. Final Drawin;zs. Upon completion of the Work and prior to final acceptance, Developer <br />shall deliver to City a set of "as -built" drawings consistent with the Conditions. These drawings shall be <br />in a form reasonably acceptable to the City Engineer, shall be certified as being "as -built" and shall reflect <br />the Work as actually constructed, with any and all changes incorporated therein. Said drawings shall be <br />signed and sealed as accurate by the engineer of record. <br />REV: 02-20-15 VR <br />Page 10 of21 <br />ArMAGR 2015.0341SunCap Redwood LLC (IA) <br />
The URL can be used to link to this page
Your browser does not support the video tag.