6.1.A. - Page 23 <br />A copy of any Geotechnical Reports will be provided to the City. <br />The geotechnical investigations are proposed to be completed on or prior to <br />March 3, 2017. If conditions in the channels prevent meeting that deadline (for <br />example, if there is enough water in the Creek to prevent the drilling rig from <br />reaching the investigation site), a "contingency extension" period is identified to <br />accommodate an additional 3 weeks to provide the investigations. In that case, <br />the geotechnical parameters necessary for the design will be assumed and the <br />investigations will be used to validate the assumptions. The Team will make <br />assumptions that are conservative enough to prevent the need for revisions to <br />the design. <br />Task 3.3 — 50% and 75% Desian Submittal. <br />The Wood Rodgers Team will develop a 50% and a 75% Design Submittal for <br />the Project. <br />50% Design Submittal <br />The 50% Design Submittal will <br />draft sheet index, draft standard <br />draft demolition and disposal p <br />new concrete slab and wall, dre <br />draft staging areas. <br />nclude drawings showing a draft title sheet, a <br />notes and details, a draft survey control plan, a <br />an, draft construction details, draft sections of <br />ft plan and profile drawing (as necessary), and <br />The 50% Design submittal will include the Basis of Design Memorandum and <br />Geotechnical reports. The 50% Design Submittal will be provided to the City for <br />comments. <br />75% Design Submittal <br />The 75% Design Submittal will include complete construction drawings consisting <br />of a title sheet, a sheet index, standard notes and details, construction notes, a <br />survey control plan, a demolition and disposal plan, minor utility relocations (if <br />required), connection details, construction details, sections of new concrete slab <br />and wall, site restoration work, bracing system, plan & profile drawings (as <br />necessary), technical specifications, possible staging areas, and an estimate of <br />construction costs. <br />The 75% Design Submittal shall also include draft supporting calculations and <br />analyses, and will document responses to the City's comments on the 50% <br />Design Submittal. <br />Wood Rodgers will prepare the documents and will present four (4) hard copy <br />sets of both the fifty -percent (50%) and the seventy-five percent (75%) plans, <br />specifications, and Engineer's Estimate to the City for review. Wood Rodgers will <br />also provide an electronic copy of the drawings in AutoCAD (version 2015 or <br />latest version) and in PDF format, specifications in Word, calculations, cost <br />estimate, and probable construction schedule in Excel and PDF. <br />REV: 12.01-16 RL <br />Page 19 of 23 <br />ATTY/AGR.2016.325NVood Rodgers, Inc. <br />