Laserfiche WebLink
D. TIME SCHEDULE <br />The following is the consultant's summary of the proposed work schedule for the <br />project: <br />I Task 1 — PROJECT MANAGEMENT <br />239 <br />Thu 12/1/16Tue <br />10/31/16 <br />1.1 DesJyn Criteria <br />239 <br />Thu 12/1/16 <br />I Tue 10/31/16 <br />1.2 Quality Assurance <br />239 <br />Thu 12/1/16 <br />1 Tue 10/31/16 <br />1.3 Meetings <br />239 <br />Thu 12/1/16 <br />1 Tue 10/31/16 <br />1.4 Invoicin. Project Status ReQorts <br />239 <br />Thu 12/1116 <br />1 Tue 10/31/16 <br />Task 2 — SURVEYING AND UTILITIE-S RESEARCH <br />60 <br />Thu 12/1/16 <br />Wed 2/22/17 <br />2.1 CollecUReview Documents <br />40 <br />Thu 12/1/16 <br />Wed 1/25/17 <br />2.2 Site Visits <br />20 <br />Thu 12/15/16 <br />Wed 1/11/17 <br />2.3 Refined Improvements Matrix/Mai), Cost <br />25 <br />Thu 12/1/16 <br />Wed 1/4/17 <br />2.4 Field Surveys <br />30 <br />Mon 1/2/16 <br />Fri 2/10/17 1 <br />2.5 Property Lines <br />60 <br />Thu 1211/16 <br />1 Wed 2/22/17 I <br />2.6 Base luta <br />60 <br />Thu 12/1/16 <br />1 Wed 2/22/17 1 <br />Task 3 — INITIALbESIGN (50% & 75% DESIGN <br />90 <br />Thu 12/1/16 <br />Wed 4/5117 <br />SUBMITTAL <br />3.1 Basis of Deesign Memorandum <br />42 <br />Thu 12/1/16 <br />Fri 1/27/17 1 <br />32 Geotechnical Rvorts <br />80 <br />Thu 12/15/16 <br />Fri 3/3/17*** <br />3.3 50% Des�n Submittal <br />45 <br />Mon 1/2/16 <br />1 Fri 3/3/17 <br />75% Des)gp Submittal 1 <br />21 <br />Fri 2/17/17 <br />1 Fri 3/3/17 <br />Task 4 — FINAL DESIGN (100% DESIGN <br />11 <br />Fri 3/17117 <br />Fri 3/31/17 <br />SUBMITTAL) <br />Construction Documents 1 <br />0 <br />Fri 3/31/17 <br />Fri 3/31/17 <br />Task 5 — BID SUPPORT AND CONSTRUCTION <br />148 <br />Mon 4/3/17 <br />Tue 10/31/17 <br />SERVICES <br />Construction 1 <br />109 <br />Thu 6/1/17 <br />1 Thu 10/31/17 1 <br />Task 6 — ADDITIONAL GEOTECHNICAL SERVICES I <br />Task 7 — ADDITIONAL CONSTRUCTION SUPPORT <br />SERVICES <br />***Contingency extension to 3/31/17 <br />E. COMPENSATION <br />Consultant shall perform the Scope of Work described for an amount not to <br />exceed two hundred thirty-five thousand, six hundred seventy-four and 00/100 <br />dollars ($235,674). Consultant shall be paid for time and materials spent at the <br />end of the month payable within (30) days following City's receipt of acceptable <br />deliverables. <br />Consultant's detailed breakdown of their level of effort and fees is shown below: <br />REV: 12.01-16 RL <br />Page 22 of 23 <br />ATTY/AGR.2016.325/Wood Rodgers, Inc. <br />