My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Huffman Broadway Group, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Under 60K
>
Agmt16 Huffman Broadway Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2016 3:19:06 PM
Creation date
12/19/2016 3:18:10 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Huffman Broadway Group, Inc.
PROJECT NAME
Redwood Creek Improveent Project- Permit compliance support services
RMP File Number
304.5
Date
12/16/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCOPE OF SERVICES <br />A. PROJECT DESCRIPTION <br />The City of Redwood City (City) seeks to improve the concrete lined sections of Redwood <br />Creek in connection with the 2017 Redwood Creek Improvement Project. Over time, some <br />sections of concrete lined channels and box culverts developed deficiencies such as cracking, <br />spalling, exposed, damaged and/or corroded reinforcing steel, joint filler deterioration, <br />horizontal/vertical joint displacements, and wall rotations. The City would like to repair and <br />rehabilitate these concrete structures to improve their conditions. As a result, the City <br />obtained permits from the US Army Corps of Engineers, California Regional Water Quality <br />Control Board, and California Department of Fish and Wildlife to work on the improved <br />portions of Redwood Creek. <br />B. SCOPE OF WORK <br />In 2016, the City contracted with BKF Engineers for the engineering and construction services <br />to address deficiencies identified in two selected reaches of the Redwood Creek in connection <br />with the 2016 Redwood Creek Repair and Rehabilitation Project. The selected reaches are as <br />follows: <br />Jefferson Branch Reach 1 — Redwood Creek Jefferson Branch from Hudson Street to <br />Madison Avenue (approximately 300 linear feet). <br />Redwood Branch Reach 1 — Redwood Creek Redwood Branch from Broadway Street to <br />Maple Street (approximately 1400 linear feet). <br />The City is currently contracting with Wood Rodgers, Inc. for the engineering and construction <br />services to address deficiencies identified in two selected reaches of the Redwood Creek in <br />connection with the 2017 Redwood Creek Improvement Project. The selected reaches are as <br />follows: <br />Jefferson Branch Reach 2 — Redwood Creek Jefferson Branch from Clinton Street and EI <br />Camino Real (approximately 1000 linear feet). <br />Redwood Branch Reach 2 — Redwood Creek Redwood Branch from Hudson Street to Oak <br />Street (approximately 1500 linear feet). <br />Please note the designs for Jefferson Branch Reach 2 and Redwood Branch Reach 2 have <br />not been completed and that the scope of design and construction work for the 2017 <br />Redwood Creek Improvement Project may change. <br />This project involves the permit compliance support services for the 2016 Redwood Creek <br />Repair and Rehabilitation Project and the 2017 Redwood Creek Improvement Project by a <br />qualified engineering firm. Permits include, but are not limited to, California Department of <br />Fish and Wildlife (CDFW) Streambed Alteration Agreement dated August 24, 2015, U.S. <br />Army Corps of Engineers (USACE) NWP-3 Maintenance authorization dated October 23, <br />2015 (File No. 2014-00340S), and Regional Water Quality Control Board Water Quality <br />Certification dated October B, 2015. <br />Please see map below showing the project reaches as described above <br />REV: 12-08-16 RL <br />PROJECT LOCATION MAP <br />Page 5 of 9 <br />ATTYIAGR.2016.327/Huffman-Broadway Group, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.