My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Kennedy Jenks
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Kennedy Jenks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 10:36:18 AM
Creation date
9/7/2004 8:42:33 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy Jenks Consultants
PROJECT NAME
recycled water
RMP File Number
304 (was an 802)
Date
9/3/2004
MO Ref
04-163 05-165
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4.3.2 Preliminary Construction Cost Estimate and Schedule <br /> <br />4.4 Submit Preliminary Retrofit Design to City for Customer Review <br /> <br />Task 5 - Final Retrofit Design <br />5.1 Final Design Drawings <br /> <br />5.2 Final Construction Cost Estimate and Schedule <br /> <br />5.3 Submit Final Design Package to City <br />Task 6 - Design Package Approval Coordination (each individual customer site) <br /> <br />6.1 City Approval <br />6.2 DHS Approval <br /> <br />Task 7 - Bidding Services <br />7.1 Prepare strategy and criteria for grouping sites into bid packages <br /> <br />7.2 Prepare Contract Documents (Group 1 Sites) <br />7.3 Bid Support (Group 1 Sites) <br /> <br />Task 8 - Construction Management Services <br />8.1 Construction Engineering Support (Group 1 Sites) <br /> <br />8.2 Construction Observation Services (all Sites) <br />8.3 Construction Management (Group 1 Sites) <br /> <br />8.4 Cross-Connection Testing and Conversion (all Sites) <br />8.5 Coordinate Final Inspection and Contract Close-out (Group 1 Sites) <br /> <br />Task 9 - Customer Site Supervisor Training <br />Task 10 - As-Built Site Retrofit Documents (all Sites) <br />Task 11 - Program Management Support Services <br /> <br />Task 12 - Supplemental Services <br /> <br />Task 1 - Project Management and Administration <br />This task includes project management and administrative services necessary to complete the <br />tasks defined in this scope of services over the contract period. These tasks include managing <br />in-house staff and subconsultants; monitoring the scope, schedule and budget; planning and <br />monitoring project activities; and preparing monthly budget status reports including invoices for <br />services. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.