My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Kennedy Jenks
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Kennedy Jenks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 10:36:18 AM
Creation date
9/7/2004 8:42:33 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy Jenks Consultants
PROJECT NAME
recycled water
RMP File Number
304 (was an 802)
Date
9/3/2004
MO Ref
04-163 05-165
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Services shall include review of shop drawings and responses to requests for information and <br />clarification. Consultant shall provide design services, if needed during construction for change <br />order related work. These services may including preparation of drawings, specifications, and <br />cost estimates. It is anticipated that 108 engineering labor hours will be required per Group Bid <br />for Construction Engineering Support. <br /> <br />Task 8.2 - Construction Observation Services <br /> <br />Visit the Project sites to observe construction at critical points, discuss with Contractor the <br />correction of any defects, and make recommendations as to replacement or correction of <br />defective work. It is anticipated that construction observation will be performed on a part time <br />basis, depending upon the complexity of the retrofit and customer related issues. It is <br />anticipated that 24 construction observation labor hours will be required per site. <br /> <br />Task 8.3 - Construction Management <br /> <br />Receive and review all certificates of inspections, tests and approvals. Consultant's review of <br />such certificates will be for the purpose of determining that the results certified indicate <br />compliance with the Contract Documents and will constitute an independent evaluation that the <br />content or procedures of such inspections, tests or approvals comply with the requirements of <br />the Contract Documents. The independent evaluation does not constitute certification of <br />inspections, only that they conform to contract documents. <br /> <br />Assist the City in coordinating and scheduling the startup and for refining and adjusting the <br />system or equipment. Upon completion of the individual site Retrofits, Consultant shall advise <br />City in writing that the Retrofit has been completed in accordance with the construction contract <br />documents and any changes thereto, in accordance with all applicable codes, ordinances and <br />regulations. Review contractor's submittals for measurement and payment of work, and <br />recommendation to the City for payment on a monthly basis during construction. <br /> <br />It is anticipated that 214 labor hours will be required for Construction Management Services for <br />the Group 1 Bid. <br /> <br />Task 8.4 - Cross-Connection Testing and Conversion <br />Consultant shall provide oversight during the cross-connection tests. These tests will be <br />conducted by the contractor and performed before connecting the Customer's recycled water <br />system to the Water Utility's recycled water system at any use-site where both recycled and <br />potable water are present. It is anticipated that 3 labor hours per site will be required for Cross- <br />Connection Testing and Conversion. <br /> <br />Task 8.5 - Coordinate Final Inspections and Contract Close-out <br /> <br />Consultant will coordinate with the Program to conduct a final on-site inspection to satisfy State <br />DHS requirements. This inspection will be coordinated with the final cross-connection test and <br />will cover the following: <br />· Check for use of proper equipment for retrofit installation <br />· Placement of all required tags, labels and signs <br />. Check for runoff or windblown spray outside the approved use area <br />. Check for ponding of recycled water within the use area <br />. Check spray patterns for encroachment on public facilities <br />Agreement over $1 OK 13 <br />KennedyJenks Rev-2 112603 <br />
The URL can be used to link to this page
Your browser does not support the video tag.