B. Liouidated Damaoes <br />1. City and Contractor recognize that time is of the essence of this Agreement <br />and that City will suffer financial loss in the form of lost revenues, contract <br />administration expenses (including project management and consultants' <br />expenses), delay and loss of public use, if the Work is not completed within <br />the time specified in paragraph III.A.1 above plus any extensions thereof <br />allowed in accordance with the Contract documents. Consistent with Section <br />00700 (General Conditions), Contractor and City agree that because of the <br />nature of the Project, it would be impractical or extremely difficult to fix the <br />amount of actual damages incurred by City because of a delay in completion <br />of the Work. <br />2. Accordingly, City and Contractor agree that Contractor shall pay City Three <br />Thousand and No/100 dollars ($3,000.00) for each Day that expires afterthe <br />time specified in Paragraph III.A.1 of this Section 00520 for Contractor to <br />achieve Substantial Completion, until such date as contractor achieves <br />Substantial Completion. <br />C. Liquidated damages for delay shall only cover and be in lieu of the actual damages <br />suffered by City as a result of delay referenced above. Liquidated damages shall not <br />cover the cost of completion of the Work, damages resulting from defective work, cost <br />of temporary replacement facilities, damages suffered by others who then seek to <br />recover their damages from City (for example, delay claims of other contractors or <br />subcontractors), and defense costs thereof. <br />IV. CITY'S ENGINEER AND REPRESENTATIVES <br />Reserved <br />V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br />In order to induce City to enter into this Agreement, Contractor makes the following <br />representations and warranties: <br />A. Contractor has visited the Site and has examined thoroughly and understood the <br />nature and extent of the Work, Site, locality, actual conditions, as built conditions, and <br />all local conditions and federal, state and local laws and regulations that in any <br />manner may affect cost, progress, performance or furnishing of Work or which relate <br />to any aspect of the design and the means, methods, techniques, sequences or <br />procedures of construction to be employed by Contractor and safety precautions and <br />programs incident thereto. <br />B. Contractor has examined thoroughly and understood all reports of exploration and <br />tests of subsurface conditions, drawings or reports, available for design and <br />construction purposes, of physical conditions, or which may be apparent at the Site <br />and accepts the determination set forth in these Sections and Section 00700 (General <br />Conditions) of the limited extent of the information contained in these Sections upon <br />which the Contractor may be entitled to rely. Contractor agrees that except for the <br />information so identified, Contractor does not and shall not rely on any other <br />information contained in these Sections. <br />C. Contractor has considered the physical conditions at or contiguous to the Site or <br />otherwise which may affect the cost, progress, performance or furnishing of Work, as <br />Contractor considers necessary for the performance or furnishing of Work at the <br />Contract Sum, within the Contract Time and in accordance with the other terms and <br />conditions of Contract documents, including specifically the provisions of the General <br />Conditions. <br />AGREEMENT <br />REDWOOD SHORES POTABLE WATER TRANSMISSION SYSTEM SEISMIC IMPROVEMENT PROJECT <br />