Laserfiche WebLink
TABLE 1: MITIGATION MONITORING AND REPORTING PROGRAM <br />Timeframe Responsibility Oversight <br />Impact Mitigation Measures for for of <br />Implementation Implementation Implementation <br />BIOLOGICAL RESOURECES <br />Project construction could <br />MM 1310-1: Construction should commence outside of the <br />Prior to issuance of a Project Applicant Redwood City <br />disturb nesting raptors and/or <br />nesting season (February through August), if feasible. If it is not <br />grading permit. Community <br />migratory birds causing nest <br />feasible to start project construction outside of the nesting season, a <br />Development <br />abandonment and/or loss of <br />qualified ornithologist shall complete a pre -construction survey to <br />Director <br />reproductive efforts. <br />identify active raptor and/or migratory bird nests that may be <br />disturbed during project construction. This survey shall be <br />completed no more than 14 days prior to the initiation of <br />demolition/construction activities during the early part of the <br />breeding season (February through April) and no more than 30 days <br />prior to the initiation of these activities during the late part of the <br />breeding season (May through August), unless a shorter pre - <br />construction survey is determined to be appropriate based on the <br />presence of a species with a shorter nesting period, such as Yellow <br />Warblers. During this survey, the ornithologist will inspect all trees <br />and other possible nesting habitats in and immediately adjacent to the <br />construction areas for nests. If an active nest is found in an area that <br />will be disturbed by construction, the ornithologist will designate a <br />construction -free buffer zone to be established around the nest, in <br />consultation with CDFW. The buffer would ensure that raptor and/or <br />migratory bird nests will not be disturbed during project construction. <br />Trees located immediately <br />MM BIO -2: <br />Prior to issuance of a Project Applicant Redwood City <br />adjacent to the proposed <br />• As required under the City's Tree Preservation Ordinance, a tree <br />grading permit. Community <br />additions and improvements <br />removal permit will be obtained from the Director of Parks and <br />Development <br />could be harmed during project <br />Recreation prior to cutting or removing trees on the project site. <br />Director <br />construction. <br />• Prior to commencement of construction, fencing shall be placed <br />around the drip line of all trees proposed for preservation. <br />• No grading or other construction shall occur within the drip line <br />of any tree proposed for preservation except in conformance with <br />a Tree Protection Plan approved by the City Arborist. <br />ATTY/RESO.0116/ PC RESO CEQA <br />— SANDPIPER EXHIBIT B <br />David J. Powers & Associates, Inc. <br />Mitigation Monitoring and Reporting <br />Program <br />November 2016 <br />3 <br />Sandpiper Elementary School Facilities Expansion <br />