My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC16-23 PC 0116 Reso CEQA - Sandpiper
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2016
>
Reso PC16-23 PC 0116 Reso CEQA - Sandpiper
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2017 1:00:25 PM
Creation date
1/3/2017 12:05:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
12/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 1: MITIGATION MONITORING AND REPORTING PROGRAM <br />ATTY/RESO.0116/ PC RESO CEQA — SANDPIPER EXHIBIT B <br />David J. Powers & Associates, Inc. <br />Program <br />November 2016 <br />Mitigation Monitoring and Reporting <br />Sandpiper Elementary School Facilities Expansion <br />Timeframe <br />Responsibility Oversight <br />Impact <br />Mitigation Measures <br />for <br />for of <br />Implementation <br />Implementation Implementation <br />• No vehicle, equipment or materials shall be parked or stored <br />within the drip line of any tree proposed for preservation. <br />CULTURAL RESOURCES <br />Construction of the proposed <br />MM CUL -1: In the event that cultural resources are found, all <br />During all phases of <br />Project Applicant Redwood City <br />project could result in significant <br />work within 50 feet of the find will stop and a qualified professional <br />construction. <br />Community <br />impacts to buried cultural <br />archaeologist or paleontologist will examine the find. If the find is <br />Development <br />resource. <br />determined to be significant, treatment recommendations will be <br />Director <br />developed and implemented before eartlimoving or construction <br />activities can recommence within the designated resource area. <br />MM CUE. -2: In compliance with state law (Section 7050.5 of the <br />During all phases of <br />Project Applicant Redwood City <br />Health and Safety Code and Section 5097.94 of the Public Resources <br />construction. <br />Community <br />Code), in the event that human remains are encountered during <br />Development <br />grading and construction, all work within 50 feet of the find will stop <br />Director <br />and the San Mateo County Coroner's office will be notified. If the <br />remains are determined to be Native American, the Coroner will <br />notify the Native American Heritage Commission to identify the <br />"Most Likely Descendant" (MLD). The District, in consultation with <br />the MLD, will then develop and implement a plan for treatment, <br />study and reinterment of the remains. <br />GEOLOGY AND SOILS <br />Development of the proposed <br />MM GEO-1: The proposed project would be designed and <br />Prior to issuance of <br />Project Applicant Redwood City <br />project could result in increased <br />constructed using standard engineering safety techniques and would <br />building or grading <br />Community <br />differential settlement on the <br />implement all the recommendations identified in the design -specific <br />permits. <br />Development <br />project site. <br />geotechnical report prepared for the project in accordance with the <br />Director <br />2013 CBC and other state regulations. The design -specific <br />geotechnical report, along with the design -level drawings, would be <br />subject to the City and the DSA review and approval process. <br />ATTY/RESO.0116/ PC RESO CEQA — SANDPIPER EXHIBIT B <br />David J. Powers & Associates, Inc. <br />Program <br />November 2016 <br />Mitigation Monitoring and Reporting <br />Sandpiper Elementary School Facilities Expansion <br />
The URL can be used to link to this page
Your browser does not support the video tag.