My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC16-23 PC 0116 Reso CEQA - Sandpiper
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2016
>
Reso PC16-23 PC 0116 Reso CEQA - Sandpiper
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2017 1:00:25 PM
Creation date
1/3/2017 12:05:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
12/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Impact <br />TABLE 1: MITIGATION MONITORING AND REPORTING PROGRAM <br />Mitigation Measures <br />ATTY/RES0.01 161 PC RESO CEQA —SANDPIPER EXHIBIT B <br />David J. Powers & Associates, Inc. <br />Program <br />November 2016 <br />Timeframe <br />fo r <br />Implementation <br />Prior to and during <br />construction. <br />Responsibility Oversight <br />for of <br />Implementation implementation <br />Project Applicant <br />Redwood City <br />Community <br />Development <br />Director <br />Mitigation Monitoring and Reporting <br />5 Sandpiper Elementary School Facilities Expansion <br />NOISE <br />Construction of the proposed <br />MM NOI-1: <br />project could result in temporary <br />• Limit construction to the hours of 8:00 AM to 5:00 PM on <br />noise impacts to residences in <br />weekdays, and 9:00 AM to 5:00 PM on Saturdays, with no noise <br />the vicinity of the project site, if <br />generating construction on Sundays or holidays. <br />applicable General Plan policies <br />• Control noise from construction workers' radios to the point <br />are not implemented. <br />where they are not audible at existing residences that border the <br />project site. <br />• Equip all internal combustion engine driven equipment with <br />mufflers that are in good condition and appropriate for the <br />equipment. <br />• Utilize quiet models of air compressors and other stationary noise <br />sources where technology exists. <br />• Locate stationary noise generating equipment as far as possible <br />from sensitive receptors when sensitive receptors adjoin or are <br />near a construction project area. <br />• Prohibit unnecessary idling of internal combustion engines. <br />• Notify residents adjacent to the project site of the construction <br />schedule in writing. <br />ATTY/RES0.01 161 PC RESO CEQA —SANDPIPER EXHIBIT B <br />David J. Powers & Associates, Inc. <br />Program <br />November 2016 <br />Timeframe <br />fo r <br />Implementation <br />Prior to and during <br />construction. <br />Responsibility Oversight <br />for of <br />Implementation implementation <br />Project Applicant <br />Redwood City <br />Community <br />Development <br />Director <br />Mitigation Monitoring and Reporting <br />5 Sandpiper Elementary School Facilities Expansion <br />
The URL can be used to link to this page
Your browser does not support the video tag.