Laserfiche WebLink
01/09/2017 <br />65. Elevator Requirements — The following requirements for elevators apply: <br />[SDR][BUILDING][FIRE] <br />a. One elevator shall be available for use as an accessible means of egress <br />in case of emergency. <br />b. All buildings with one or more passenger service elevators shall be provided <br />with not less than one medical emergency service to all landings. The <br />medical emergency service elevator shall accommodate the loading and <br />transport of an ambulance gurney or stretcher (maximum size 24 inches by <br />84 inches) in the horizontal position. <br />c. One elevator shall be connected to backup generator power in order to <br />remain operable during emergencies. This elevator shall be provided with <br />appropriate signage and shall extend to all floors including the lower levels <br />of the parking structure <br />All additional elevators shall be connected to battery backup with sufficient <br />power to bring the elevator to the exit level in the event of an emergency. <br />e. All elevators shall be equipped with smoke curtains. <br />Construction -Related Activities <br />66. Sales and Use Taxes — For commercial projects with a valuation of over $10 <br />million, register with the Board of Equalization to create an ID prior to project <br />construction and operation. This maximizes the City's allocation of sales and use <br />taxes associated with project construction. Contact Nancy Murguia, Finance <br />Department, at (650) 780-7097 or nmurguia@redwoodcity.org. [COA][FINANCE] <br />67. Hours of Construction — Construction activity is permitted between 7:00 a.m. and <br />8:00 p.m. Monday through Friday, except as permitted on weekends by the <br />Building Official, and shall adhere to the City's Noise Ordinance. If possible, the <br />noisiest construction activities would be scheduled for daytime hours when the <br />ambient noise levels are highest. [SDR][BUILDING] <br />68. Construction Meetings — The applicant is required to contact the Permit Counter <br />(650.780.7350) to schedule the following meetings prior to or during construction. <br />[COA][BUILDING] <br />Pre -Submittal — Prior to building permit submittal, schedule a pre -submittal <br />meeting with Building, Planning, Engineering and Fire staff to discuss the <br />permitting process and submittal requirements. <br />b. Pre -Construction -After City permits are issued, but prior to start of construction, <br />schedule a pre -construction meeting with Engineering, Building, Fire, and <br />Planning staff to discuss the inspection process and requirements for construction <br />and site work. The applicant shall arrange for the attendance of the owner, <br />ATTY/RESO.0127/CC RESO APPROVING PERMIT FOR 603 JEFFERSON RESO. NO. 15554 <br />REV: 12-19-16 VR MUFF NO. 603 <br />Page 18 of 24 <br />