My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-09-13
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-09-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 4:00:31 PM
Creation date
9/9/2004 1:08:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/13/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�~ I f� ' f/ <br /> Alternatives <br /> (1) Hire additional crew members to perform the work in-house in lieu of this contract. It <br /> was determined that the contract option is better based on: <br /> � the trench repairs are not a full-time activity and occur randomly <br /> • the cost of an additional full time crew and equipment would be more expensive <br /> than this contract <br /> • the inclusion of the concrete repairs <br /> • the general fund budget cannot afford to support the additional crew members <br /> during the remainder of their work schedule beyond trench repair. <br /> (2) All the trench repairs could be performed by existing City staff. Staff would have to <br /> delay necessary pavement maintenance and preservation and temporary sidewalk <br /> maintenance in order to perform the trench repairs. Reduced staffing under the <br /> current budget circumstances further diminishes this option. <br /> (3) The service could be re-bid. The City received a valid bid for the work. <br /> � Fiscal Impact <br /> Funds have been approved in the appropriations for the 2004-2005 Public Works Services <br /> water and wastewater systems maintenance budgets in the amount of $82,000 in sanitary <br /> sewer and $145,358 in water. Staff will manage the utility repairs within the budgeted <br /> utilities funding ($227,358). <br /> � <br /> � _�� <br /> Go don Mann Peter Ingram Ed E erett <br /> Public Works Superintendent Director, Public orks Services City Manager <br /> Attachments <br /> None <br /> Specifications are available for review in the City Clerks Office <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.