My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-01-23 Closed and Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-01-23 Closed and Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 10:22:46 AM
Creation date
1/19/2017 3:58:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/23/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
645
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 4.0 – Environmental Setting and Discussion of Impacts <br /> <br /> <br />City of Redwood City 44 Initial Study/Mitigated Negative Declaration <br />Sandpiper Elementary School Facilities Expansion November 2016 <br />4.6.3.3 Construction Impacts (Checklist Question 2) <br /> <br />Project construction would disturb the ground and expose soils, thereby, increasing the potential for <br />wind or water related erosion at the site until construction is complete. As discussed in Section 4.3, <br />Air Quality and Section 4.9, Hydrology and Water Quality, the proposed project would be required to <br />implement the BAAQMD Basic Construction Mitigation Measures identified in MM AIR-1 and <br />RWQCB Best Management Practices that, upon implementation, would reduce project fugitive dust, <br />erosion, and water quality impacts to a less than significant level. (Less Than Significant Impact <br />with Mitigation Incorporated) <br /> <br />4.6.3.4 Other Hazards (Checklist Questions 3 and 5) <br /> <br />The project site and surrounding area are flat. Therefore, there is no potential for landslides to affect <br />the proposed project. The proposed project would include infrastructure to adequately accommodate <br />the disposal of wastewater. The project does not include septic tanks or alternative wastewater <br />disposal systems. (No Impact) <br /> <br />4.6.4 Conclusion <br /> <br />The proposed project, with implementation of the recommendations in the design-specific <br />geotechnical report prepared for the proposed project and identified in MM GEO-1, BAAQMD Basic <br />Construction Mitigation Measures, and RWQCB Best Management Practices, would not result in <br />significant geology and soils impacts. (Less Than Significant Impact with Mitigation <br />Incorporated) <br />7.A. - Page 75
The URL can be used to link to this page
Your browser does not support the video tag.