Laserfiche WebLink
<br /> ATTY/RESO.0116/ PC RESO CEQA – SANDPIPER EXHIBIT B <br />David J. Powers & Associates, Inc. Mitigation Monitoring and Reporting <br />Program <br />November 2016 5 Sandpiper Elementary School Facilities Expansion <br />TABLE 1: MITIGATION MONITORING AND REPORTING PROGRAM <br />Impact Mitigation Measures <br />Timeframe <br />for <br />Implementation <br />Responsibility <br />for <br />Implementation <br />Oversight <br />of <br />Implementation <br /> <br /> <br />NOISE <br />Construction of the proposed <br />project could result in temporary <br />noise impacts to residences in <br />the vicinity of the project site, if <br />applicable General Plan policies <br />are not implemented. <br />MM NOI-1: <br />• Limit construction to the hours of 8:00 AM to 5:00 PM on <br />weekdays, and 9:00 AM to 5:00 PM on Saturdays, with no noise <br />generating construction on Sundays or holidays. <br />• Control noise from construction workers' radios to the point <br />where they are not audible at existing residences that border the <br />project site. <br />• Equip all internal combustion engine driven equipment with <br />mufflers that are in good condition and appropriate for the <br />equipment. <br />• Utilize quiet models of air compressors and other stationary noise <br />sources where technology exists. <br />• Locate stationary noise generating equipment as far as possible <br />from sensitive receptors when sensitive receptors adjoin or are <br />near a construction project area. <br />• Prohibit unnecessary idling of internal combustion engines. <br />• Notify residents adjacent to the project site of the construction <br />schedule in writing. <br />Prior to and during <br />construction. <br />Project Applicant Redwood City <br />Community <br />Development <br />Director <br /> 7.A. - Page 149