My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC16-20 0001 PC Reso 1409 El Camino
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC16-20 0001 PC Reso 1409 El Camino
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2017 4:49:17 PM
Creation date
1/19/2017 4:46:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
1/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Transportation Impact Fee - Pay a Transportation Impact Fee for the net <br />new trips resulting from the proposed project, estimated at $167,156. [SDRI <br />[ENGINEERING] <br />6. Parks Impact Fee — Pay a Parks Impact Fee for the net new dwelling units <br />resulting from the proposed project, estimated at $2,999,990.14 prior to final <br />map approval.S[ DRI[PARKS] <br />7. Affordable Housing Impact Fee — The applicant shall enter into an <br />affordable housing agreement with the City of Redwood City for the provision <br />of 35 affordable units at the low-income level as part of the project. In <br />accordance with the City's Affordable Housing Impact Fee requirement, the <br />applicant must also pay a fee, estimated at $1,237,852. <br />8. School Impact Fee — For residential additions greater than 500 square feet <br />and new commercial or industrial construction, pay a School Impact Fee to <br />the Seauoia Union Hiah School District. Information regarding this fee may <br />be obtained by contacting the Sequoia Union High School District at (650) <br />369-1411. [SDR][SCHOOL DISTRICT] <br />9. Water and Sewer Fees — Pay applicable water, recycled water, and <br />wastewater -related fees as outlined on the Citv's website. <br />[SDRI[ENGINEERING] <br />10. Notice of Fees Protest — The applicant may protest any fees, dedications, <br />reservations, or other exactions imposed by the City as part of the approval <br />or as a condition of approval of this development. Per California Government <br />Code Section 66020, this 90 -day protest period has begun as of the date of <br />the approval of this application. [SDR][OFFICE OF THE CITY ATTORNEY] <br />Landscapina and Site Improvements <br />11. Water -Efficient Landscaping — Provide a landscaping and irrigation plan <br />conforming to the California Water -Efficient Landscape Ordinance (AB 1881), <br />including an automatic irrigation system (drip, micro -spray, or bubblers) with <br />a rain sensor, and show these measures on the building permit plans. <br />[COA][PLANNING] <br />12. Tree Survey - Provide a tree survey that identifies type, diameter at breast <br />height (DBH), condition and location prior to building permit issuance. <br />[COA][PLANNING] <br />13. Tree Protection -Provide tree protection measures for ordinance -sized trees <br />near the project and show these measures on the building permit plans. <br />[COA][PLANNING] <br />14. Tree Removal Permit - Obtain a Tree Removal Permit for the removal and <br />Page 8 of22 <br />ATTY/RESO.0001/PC RESO 1409 EL CAMINO <br />REV: 01-19-17 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.