My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 LSA Associates, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 LSA Associates, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2017 11:48:50 AM
Creation date
2/6/2017 8:45:53 AM
Metadata
Fields
Template:
Agreement
Contractor Name
LSA Associates, inc
PROJECT NAME
CEQA for 1548 Maple St.
RMP File Number
304
Date
2/2/2017
MO Ref
17-006
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. SCOPE OF WORK <br />LSA will undertake the following tasks, as <br />identified in Table 1, Work Program Outline, <br />and described in greater detail below, for <br />preparation of the EIR and Initial Study for the <br />proposed project. <br />TASK A. PROJECT INITIATION <br />Project initiation will consist of several tasks, <br />including attendance at a project start-up <br />meeting, a site visit/field surveys, and data <br />gathering and review. The project description <br />for the EIR, which will also be used for the <br />Notice of Preparation (NOP) and Initial Study <br />will also be prepared as part of project <br />initiation subtasks. <br />1. Start -Up Meeting/Site Visit <br />LSA attended a start-up meeting with City <br />staff on February 7, 2017. At this meeting, the <br />project team discussed elements of the <br />proposed project, the status of the develop- <br />ment application, and various data needs. <br />Subsequent to the start-up meeting, the <br />approach to environmental review was <br />revised. <br />LSA will also visit the project site to familiarize <br />ourselves with existing conditions and site <br />features. Photographs of the site and adjacent <br />land uses will be obtained during the site visit. <br />2. Data Gathering and Evaluation <br />Existing data and analyses applicable to the <br />project site and vicinity will be collected and <br />evaluated. These include the IHSP and its <br />LSA <br />Table 1: Work Program Outline <br />TASK A. <br />PROJECT INITIATION <br />1. <br />Start -Up Meeting/Site Visit <br />2. <br />Data Gathering and Review <br />3. <br />Notice of Preparation/Scoping Session <br />4. <br />Project Description <br />S. <br />Work Program Refinement <br />TASK B. <br />INITIAL STUDY <br />1. <br />Administrative Draft Initial Study <br />a. Aesthetics <br />b. Agriculture and Forestry Resources <br />c. Geology and Soils <br />d. Greenhouse Gas Emissions <br />e. Mineral Resources <br />f. Parks and Recreation <br />g. Population and Housing <br />h. Public Services <br />L Tribal Cultural/AB 52 Consultation <br />j. Mandatory Findings <br />2. <br />Screencheck Draft Initial Study <br />3. <br />Public Review Draft Initial Study <br />TASK C. <br />ENVIRONMENTAL IMPACT REPORT <br />1. Setting and impacts <br />a. Land Use and Planning <br />b. Biological Resources <br />c. Cultural Resources <br />d. Transportation and Circulation <br />e. Air Quality <br />f. Noise <br />g. Hazards and Hazardous Materials <br />h. Hydrology and Water Quality <br />I. Utilities and Service Systems <br />2. Alternatives Analysis <br />3. Other CEQA Considerations <br />4. Administrative Draft EIR <br />S. Screencheck Draft EIR <br />6. Public Review Draft EIR <br />TASK D. RESPONSE TO COMMENTS DOCUMENT <br />1. Administrative Draft RTC Document <br />2. Screencheck Draft RTC Document <br />3. Final RTC Document <br />4. Mitigation Monitoring and Reporting Program <br />5. Findings of Fact and Statement of Overriding <br />Considerations <br />4. Administrative Record <br />Draft EIR, other background documents TASK E. PUBLIC HEARINGS AND MEETINGS <br />obtained from the City and/or the applicant, TASK F. PROJECT MANAGEMENT <br />and applicable Redwood City planning, policy, <br />and environmental documents. We assume that the primary source of background information on the <br />project site and surroundings will be the IHSP Draft EIR and associated technical studies. <br />4/21/17 (P \RWC1401D 1548 Maple St\ADMIN\Contrad\EIR SOW\1548 Maple EIR SOW 04-21-17,doa) <br />Page 5 of 27 <br />ATTY/AGR/2017/AMENDMENTS/AMEND NO.1 LSA ASSOCIATES INC. <br />REV: 05-03-17 VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.