My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 LSA Associates, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 LSA Associates, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2017 11:48:50 AM
Creation date
2/6/2017 8:45:53 AM
Metadata
Fields
Template:
Agreement
Contractor Name
LSA Associates, inc
PROJECT NAME
CEQA for 1548 Maple St.
RMP File Number
304
Date
2/2/2017
MO Ref
17-006
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FEHRtPEERS <br />April 20, 2017 <br />Theresa Wallace <br />LSA Associates, Inc. <br />2215 Fifth Street <br />Berkeley, CA 94710 <br />Subject: 7548 Maple Street EIR Section Scope of Work <br />Dear Theresa: <br />We are pleased to present the following scope of work to prepare the transportation section of the <br />Draft Environmental Impact Report (DEIR) for the proposed 1548 Maple Street residential <br />development (Project) in Redwood City. Our scope of work and associated fee are presented below. <br />SCOPE OF WORK <br />Fehr & Peers proposes to conduct the following eight tasks to prepare the transportation section <br />of the 1548 Maple Street DEIR. Due to the small size of the Project, it is unlikely to generate enough <br />peak hour trips to be subject to the San Mateo City/County Association of Governments (C/CAG) <br />Transportation Demand Management (TDM) requirements. Therefore, these tasks are not included <br />in the below scope of work. If the City requests these tasks, the scope of work and fee would need <br />to be adjusted accordingly. The Project is located within the formerly proposed Inner Harbor <br />Specific Plan (IHSP) Area. The IHSP underwent a City and public review process, but was ultimately <br />not adopted. This scope of work builds off the scope of work and methodologies that were <br />previously approved by the City for the IHSP DEIR. <br />Task 1 — Data Collection <br />Based on the Project's location, we assume the DEIR will contain a similar study area and similar <br />study facilities to those for the IHSP DEIR. Existing intersection turning movement counts for IHSP <br />study intersections were collected in 2014 and traffic patterns likely have recently changed in the <br />study area. Therefore, Fehr & Peers will collect new weekday morning (7:00 to 9:00 AM) and evening <br />(4:00 to 6:00 PM) peak period traffic counts for up to eight study intersections, two freeway <br />segments, and four freeway ramps identified below. Counts will be conducted mid -week and while <br />area schools are in session. <br />Study Intersections <br />1. Veterans Boulevard / Whipple Avenue <br />2. Whipple Avenue / U.S. 101 Northbound Off -Ramp <br />3. East Bayshore Road / Bair Island Road / Blomquist Street extension (Roundabout) <br />4. Maple Street/ Veterans Boulevard <br />5. Blomquist Street / Maple Street (Side -street Stop Controlled) <br />332 Pine Street, 4"' Floor San Francisco, CA 94104 (415) 348-0300 Fax (415) 773-1790 <br />www.fehrand peers. corn <br />Page 22 of 27 <br />ATTY/AGR/2017/AMENDMENTS/AMEND No.1 LSA ASSOCIATES INC. <br />REV: 05-03-17 VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.