My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Dewey Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 Dewey Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 5:02:03 PM
Creation date
2/22/2017 10:22:13 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Dewey Services, Inc.
PROJECT NAME
Vector Control Services
RMP File Number
304
Date
2/22/2017
MO Ref
17-021
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Any bait containers overlooked and not removed the previous year shall be <br />removed by the Contractor at the time of installation at no cost to the City <br />I. Bait Insvection, Replacement, Reinstallation and Removal: Inspections along the <br />creek shall be made at thirty (30) day intervals to determine the condition of the <br />bait and to service and maintain the bait as required. The Contractor should be <br />REV: 01-11-17 MI <br />guided in his/her performance so as not to exceed the parameters set out in <br />Exhibit B. Contractor will not be paid for unauthorized work performed, If City <br />and/or SMCMVCD desire additional work to be done by Contractor, City and/or <br />SMCMVCD will request such additional work in writing. <br />Bait containers found to be inadequately secured, positioned, marked or concealed <br />shall be corrected by Contractor in conjunction with making the inspection. The <br />correction shall be included in the inspection charge. An inspection fee shall be <br />allowed for each bait station location inspected and will include making the <br />aforesaid corrections. <br />A red colored dot is to be used at the time of installation. At each subsequent <br />inspection, a different colored enamel paint must be applied over the preexisting <br />markings as follows: <br />Installation <br />June <br />Red <br />First Inspection <br />July <br />Yellow <br />Second Inspection <br />August <br />Green <br />Third Inspection <br />September <br />White <br />Removal <br />October <br />N/A <br />Once a colored dot is located (at time of installation) the same location shall be <br />used for each subsequent inspection by affixing the appropriate color over the <br />preexisting dot. At no time should the colored dot be greater than two (2) inches <br />in diameter. If during an inspection conditions of the creek, levee or shoreline <br />have changed and Contractor believes the relocation of the bait station is <br />advisable, he/she may do so and must within two (2) days inform the Assistant <br />Manager of the change in location. The Contractor will, however, make the <br />relocation and obliterate the dot marking of the old location of the bait station at <br />no additional cost to the City. <br />Bait replacement shall be made to all bait blocks which are found to be consumed <br />or deteriorated at the equivalent of one-half (1/2) or more of their original weight. <br />Bait which is judged to be no longer palatable to rodents shall also be replaced. A <br />separate charge will be allowed in addition to the inspection for each bait block <br />replacement. <br />Bait blocks and containers found to be missing shall be reinstalled and a separate <br />charge made for each reinstallation. Contractor is again advised not to exceed the <br />parameters set out in Exhibit B. Contractor will not be paid for unauthorized <br />Page 14 of 17 <br />ATTY/AGR.2017.003/Dewey Services, Inc. - Vector Control Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.