My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 O'Grady Paving (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 O'Grady Paving (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2008 9:58:06 AM
Creation date
9/23/2004 4:53:40 PM
Metadata
Fields
Template:
Agreement
Contractor Name
O'Grady Paving
PROJECT NAME
Rolison Road & Hoover Street
RMP File Number
405
Date
9/21/2004
MO Ref
RD-04-15 04-161
Box
6599
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting <br /> the date the Contract Time commences to run as set forth in Section 00550 <br /> (Notice to Proceed) and Section 00700 (General Conditions); and <br /> 1. Contractor shall achieve Substantial Completion of the Work within <br /> Sixty (60) Calendar Days from the date the Contract Time <br /> commences to run. <br /> B. liquidated DamaQes <br /> 1. City and Contractor recognize that time is of the essence of this <br /> Agreement and that City will suffer financial loss in the form of lost <br /> revenues, contract administration expenses (including project <br /> management and consultants' expenses), delay and loss of public <br /> use, if the Work is not completed within the time specified in <br /> paragraph II I. A. 1 above plus any extensions thereof allowed in <br /> accordance with the Contract Documents. Consistent with Document <br /> 00700 (General Conditions), Contractor and City agree that because <br /> of the nature of the Project, it would be impractical or extremely <br /> difficult to fix the amount of actual damages incurred by City because <br /> of a delay in completion of the Work. <br /> 2. Accordingly, City and Contractor agree that Contractor shall pay City <br /> Five Hundred and No/100 Dollars ($500) for each Day that expires <br /> after the time specified in Paragraph 1I1.A.1 of this Document 00520 <br /> for Contractor to achieve Substantial Completion, until such date as <br /> contractor achieves Substantial Completion. <br /> C. Liquidated damages for delay shall only cover and be in lieu of the actual <br /> damages suffered by City as a result of delay referenced above. Liquidated <br /> damages shall not cover the cost of completion of the Work, damages <br /> resulting from defective work, cost of temporary replacement facilities, <br /> damages suffered by others who then seek to recover their damages from <br /> City (for example, delay claims of other contractors or subcontractors), and <br /> defense costs thereof. <br />IV. CITY'S ENGINEER AND REPRESENTATIVES <br /> Reserved <br />V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> In order to induce City to enter into this Agreement, Contractor makes the following <br /> representations and warranties: <br /> A. Contractor has visited the Site and has examined thoroughly and <br /> understood the nature and extent of the Work, Site, locality, actual <br /> conditions, as built conditions, and all local conditions and federal, state and <br /> local laws and regulations that in any manner may affect cost, progress, <br /> performance or furnishing of Work or which relate to any aspect of the <br /> design and the means, methods, techniques, sequences or procedures of <br />Attyl Agrl Agr.226 <br />081704 2 <br />- <br />