My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2017-022476 STMMA_2485 El Camino Real_Target Corp.
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2017-022476 STMMA_2485 El Camino Real_Target Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 1:00:29 PM
Creation date
3/15/2017 3:16:56 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA Agreement Target
Doc Num
2017-022476
Rec Date
3/15/2017
APN
054-112-230
Address
2485 El Camino Real
Parties
Target Corp
MO Ref
17-035
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />Flow -Through Planter Maintenance Plan for <br />TARGET STORE NO. 321 REDWOOD CITY <br />December 8, 2016 <br />Flow-through planters are designed to treat and <br />temporarily detain runoff without allowing <br />seepage into the underlying soil. They typically <br />receive runoff via downspouts leading from the <br />roofs of adjacent buildings. <br />Project Address and Cross Streets 2485 EI <br />Camino Real. San Mateo, CA 94063 /Charter <br />Street <br />Assessor's Parcel No.: 054-112-230 <br />Property Owner: Taroet Corporation <br />Phone No.: (612) 761-7034 <br />Designated Contact: John Dietrich <br />Phone No.: (612) 761-7034 <br />Mailing Address:1000 Nichollet Mall -TPN -12K, <br />Minneapolis. MN 55403 <br />The property contains one flow-through planter(s), located as described below and as shown in the <br />attached site plan: <br />Flow -Through Planter No. 1 is located at north side of building. <br />I. Routine Maintenance Activities <br />The principal maintenance objectives are to ensure that water flows unimpeded into the <br />flow-through planter and landscaping remains attractive in appearance. Table 1 shows the <br />routine maintenance activities, and the frequency at which they will be conducted. <br />Table 1 <br />Routine Maintenance Activities for Flow -Through Planters <br />No. Maintenance Task Frequency of Task <br />1 Evaluate health of trees and groundcover. Remove and replace all dead Twice a year <br />and diseased vegetation. Treat vegetation using preventative and low -toxic <br />methods. <br />2 Maintain vegetation and the irrigation system. Prune and weed to keep flow- <br />through planter neat and orderly in appearance. <br />3 Check that mulch is at appropriate depth (3 inches per soil specifications) <br />and replenish as necessary. <br />4 Check that soil is at appropriate depth. Till or replace soil as necessary to <br />maintain a minimum of 6 inches between top of mulch and overflow weir. <br />5 Remove accumulated sediment, litter and debris from flow-through planter <br />and dispose of properly. Confirm that no clogging will occur and that the box <br />will drain within three to four hours. <br />6 Inspect flow-through planter to ensure that there are no clogs. Test with <br />garden hose to confirm that the planter will drain within three to four hours. <br />7 Inspect downspouts from rooftops and sheet flow from paved areas to <br />ensure flow to planter box is unimpeded. Remove debris and repair <br />damaged pipes. Check splash blocks or rocks and repair, replace and <br />replenish as necessary. <br />„.o....,Page 1 <br />ATTY/AGR/2017.004/rARGET CORPORATION STMMA <br />REV: 01-18-17 PR <br />As needed <br />Monthly <br />Before wet season and as <br />necessary <br />Before wet season and as <br />necessary <br />Monthly during the wet season, <br />and as needed after storm <br />events <br />Monthly during the wet season, <br />and as needed after storm <br />events <br />NDS Approved 12/5/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.