Laserfiche WebLink
RECORDING REQUESTED BY AND <br />AFTER RECORDING MAIL TO: <br />CITY CLERK <br />CITY OF REDWOOD CITY <br />P.O. BOX 391 <br />1017 MIDDLEFIELD ROAD <br />REDWOOD CITY, CA 94064 <br />2017-022476 CONF <br />11:26 am 03/15/17 AG Fee: NO FEE <br />Count of pages 20 <br />Recorded in Official Records <br />County of San Mateo <br />Mark Church <br />Assessor -County Clerk -Recorder <br />11111111111111111111111111 II11111111 1EI IIII <br />* R 0 0 0 2 3 6 6 6 8 7* <br />SPACE ABOVE RESERVED FOR RECORDER'S USE <br />Exempt from recording fee per Gov. Code § 27383. <br />STORMWATER TREATMENT MEASURES <br />MAINTENANCE AGREEMENT <br />[Target, 2485 EI Camino Real] <br />THIS STORMWATER TREATMEN�MEAU S MAINTENANCE AGREEMENT <br />("Agreement") is made and entered into I ✓l.� 1�20t] ("Effective Date"), by and <br />between the City of Redwood City ("City') and Target Corporation, a Minnesota <br />Corporation, successor in interest by merger with Dayton Hudson Corporation, a <br />Minnesota Corporation. ("Property Owner"). <br />RECITALS <br />A. On November 19, 2015, the Regional Water Quality Control Board, San <br />Francisco Bay Region, adopted Order R2-2015-0049, issuing Waste Discharge <br />Requirements and National Pollutant Discharge Elimination System Permit No. <br />CAS612008 (the "NPDES Permit"); and <br />B. Provision C.3. of the NPDES Permit, as it may be amended or reissued from <br />time to time, requires the permittee public agencies to provide minimum verification and <br />access assurances that all treatment measures shall be adequately operated and <br />maintained by entities responsible for the stormwater treatment measures; and <br />C. The Property Owner is the owner of real property commonly known as <br />Target, 2485 EI Camino Real, Redwood City, CA 94063 (the "Property"), as more <br />particularly described in Exhibit "A", attached hereto and incorporated herein by this <br />reference; and <br />D. Attached hereto as Exhibit "B", and incorporated herein by this reference, <br />is a legible reduced -scale copy of the site plan showing the stormwater treatment <br />measures that are to be located or to be constructed on the Property, hereinafter <br />referred to as the "Site Plan": and <br />E. Attached hereto as Exhibit "C" and incorporated herein by this reference, <br />is a Flow -Through Planter Maintenance Plan including an Inspection and Maintenance <br />Checklist ("Inspection and Maintenance Checklist") which describes the Property <br />Owner's maintenance activities to be performed pursuant to this Agreement; and <br />ATTY/AGR/2017.004/TARGET CORPORATION STMMA <br />REV: 01-18-17 PR <br />Page 1 of 7 <br />