Laserfiche WebLink
Flow -Through Planter Maintenance Plan Date of Inspection: <br />Property Address: 2485 EI Camino Real, Redwood Citv, CA Treatment Measure No.: <br />IV. Inspections <br />The attached Flow -Through Planter Inspection and Maintenance Checklist shall be used to <br />conduct inspections monthly (or as needed), identify needed maintenance, and record <br />maintenance that is conducted. <br />w Page 3 <br />ATTY/AGR/2017.004/7ARGET CORPORATION STMMA <br />REV: 01-18-17 PR <br />