My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2017-022479 STMMA_1629 Main Street_WL Butler Office Building_3.15.2017
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2017-022479 STMMA_1629 Main Street_WL Butler Office Building_3.15.2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 1:02:38 PM
Creation date
3/15/2017 3:23:36 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA W.L. Butler Office Building
Doc Num
2017-022479
Rec Date
3/15/2017
Address
1629 Main St.
Parties
Butler Realty III, LLC
MO Ref
17-028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sloretantlon Area INalrriananca Plan for <br />W.L. Butler Office Building —1629 Main Sheet <br />January 20, 2017 <br />Project Address and Cross Straets: 1829 Main Street and EI Camino Real <br />Redwood Cly. CA 94063 <br />Assessor's Parcel No.: 052-041-010.052-176-040 <br />Property Owner. Butler Really. LLC <br />Phone No.: (65 01 667-3399 <br />Dealgnatad Contact Wallace Murfd <br />Phone No.: (6501 8673999 (same as abowit <br />Notable components to the project's storm system Include Detention Pipe (located In the drive <br />aislelparkft lot) and Storm Drain Lift Stations 0 d in the drive aisle, in a manhole structure, <br />and adjacent to the Main Street Inlet In a manhole structure.) The properly contains three (3) flow- <br />through planters (see separate Maintenance Plan) and one (1) bioretention basin, located as <br />described below and as shown In the attached wthlblts: <br />• The Blaratonlion Basin is located at the northwestern comer of the property adjacent <br />to the Highway 84 on-ramp. <br />I. Routine Maintenance Adlvltlos <br />The principal maintenance objsdive is to prevent sediment buildup and dogging, which <br />reduces pollutant removal efflclancy and may lead to bloratentlon area failure. Table 1 <br />strove the Routine maintenance activities for the bloretentlon bash and Tabu 2 shows <br />routine maintenance adivl as for the slorm drain lift station and detention pipes. Both <br />Tables 1 & 2 show the frequency at which all maintenance activities will be conducted. <br />li♦aatailWn IXtf69 Aaxtbn Oct mi Mat pts <br />board Ration dwykM, ald/linG1. pollluwft <br />a -*I cf f^J'� bbkgW Mid <br />d*micid fraa6rren(phxeaaaa Tl*w Ace ilos <br />nomsey awwdata pan bWw singe, aandbed <br />pormino ee arvw*kwornx*hleyer <br />plydig aaq ar)dpbmtL <br />Page 1 <br />Page 28 of 32 <br />REV: 01-26-17 PR <br />ATTY/AGR.2017.018/1629 Main St <br />
The URL can be used to link to this page
Your browser does not support the video tag.