My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Water Systems Consulting, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Under 60K
>
Agmt17 Water Systems Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 5:00:58 PM
Creation date
3/21/2017 4:50:46 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Water Systems Consulting, Inc.
PROJECT NAME
WQMP Update
RMP File Number
304.5
Date
3/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br />Consultant shall perform the following services: <br />TASK 1: PROJECT MANAGEMENT <br />1. Progress Reports <br />a. Submit progress reports with each monthly invoice <br />2. Data Review <br />a. Review the City's existing data, such as GIS files, WQMP sampling <br />documents and results <br />b. Evaluate additional data needs <br />3. Quality Assurance/Control <br />a. Perform comprehensive quality control of all work items being prepared for <br />delivery to the City <br />4. Meetings <br />a. Coordinate up to two (2) meetings <br />b. Provide updates on project progress, present interim results, review data <br />request log, discuss project methodologies, and review draft and final <br />deliverables <br />TASK 2: EXISTING WATER QUALITY MONITORING PLAN REVIEW <br />1. Review City's existing WQMP and sampling procedures <br />a. Review sampling station locations with respect to City's' distribution <br />system pressure zones and evaluate whether water from all pressure <br />zones and system reservoirs are being sampled <br />b. Review current WQMP sampling protocols and schedule <br />c. Develop recommended modifications to align with updated regulations, <br />including, but not limited to, the Federal and State rTCR, Lead and Copper <br />Rule, and chromium VI MCL <br />TASK 3: WATER QUALITY MONITORING PLAN MODIFICATION <br />1. Draft WQMP <br />a. Prepare required documentation for submission of an updated WQMP. <br />This will include, but not be limited to: <br />i. Modifications to the City's Bacteriological Sample Siting Plan <br />1. Identification of routine, replacement and repeat sampling <br />locations <br />2. Identification of MCL requirements and revised sampling <br />requirements for total coliforms and E. coli <br />ii. Modifications to the City's Lead and Copper testing section <br />iii. Mention of chromium VI sampling <br />iv. Preparation of the draft WQMP <br />REV: 03-03-17 MI <br />Page 9 of 11 <br />ATTY/AGR.2017.045/Water Systems Consulting - WQMP Update <br />
The URL can be used to link to this page
Your browser does not support the video tag.